Similar Projects
Preventative Maintenance for HVAC and Temperature Controls
Term Contract
Post-Bid
Less than $150,000 est. value
Indianapolis, IN 46204

LOI- Seeking Qualified Contractors for Various Services
Term Contract
Post-Bid
Marion, IN 46953

IN145 Service Building AHU-3 Controls
Results
Indianapolis, IN 46202

Preventative Maintenance for Kitchen Hood Exhaust Cleaning
Term Contract
Results
Less than $150,000 est. value
Indianapolis, IN

Cooling Tower Replacement with ACCUs
Post-Bid
$150,000 est. value
Indianapolis, IN 46219

IN024 Vannuys Medical Science - Replace AHU16-Controls
Results
Indianapolis, IN 46202

Sidney and Lois Eskenazi Hospital ED HVAC Upgrades CM Proposals
Post-Bid
Indianapolis, IN 46202

Lincoln Middle School Cooling Tower Replacement
Results
Indianapolis, IN 46200

HVAC and Mechanical Products
Term Contract
Post-Bid

Pike High School Chilled Water Plant Replacement
Results
Indianapolis, IN

WICAA Weatherization
Renovation
Post-Bid

IN031 Coleman Hall Replace HVAC Boxes and Controls
Results
Indianapolis, IN 46202

IMC CEP - Emissions Monitoring Cabinets
Post-Bid
Indianapolis, IN

IN071 Engineering and Technology Replace AHU-1 Components
Results
Indianapolis, IN

Indiana School for the Deaf Building 8 HVAC
Post-Bid
Indianapolis, IN 46205

Last Updated 12/08/2021 09:32 AM
Project Title

IPS 87 George Washington Carver Montessori HVAC Cooling Tower

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46208   (Marion County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing geothermal system in main mechanical room, along with associated reversing chiller, heat exchanger, and pumps. Well to remain. Installation of new chiller at building exterior. New chiller will require extension of existing sidewalk into parking lot and new fencing installation around chiller and existing electrical equipment to remain. New nat. gas condensing boiler shall be installed in mechanical room to function as new lead boiler. Existing boilers shall remain as backup/lag boilers. Existing pump P-4 power shall be moved onto existing emergency generator.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents