Similar Projects
Last Updated | 07/20/2023 04:37 PM |
Project Title | McBryde Sidewalk - Calder to Satsop |
Physical Address | View project details and contacts |
City, State (County) | Montesano, WA 98563 (Grays Harbor County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $575,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes all labor, materials and equipment install approximately 700 linear feet of monolithic cement concrete sidewalk and driveway approaches, installation of Hot Mix Asphalt pavement patching, clearing and grubbing, saw cutting, removal of sections of asphalt roadway and concrete driveways, subgrade preparation, roadside restoration and new signs. Related utility work includes installation of approximately 800-feet of 8-inch C900 PVC water main including valves, fittings and appurtenances, reconnection existing water meters; approximately 300 feet of 8" to 30" storm drain pipe and related catch basin. Water Main (Repair/Replace) Rehabilitation, Sidewalks/Curbs/Gutters, Storm water Improvements Est. Completion Date: Sept. 29, 2023 Est. Value: $ 575,000.00 Technical inquiries regarding the project should be directed to Mike Olden, P.E., at the City of Montesano, via email only at molden@montesano.us. An award of contract is anticipated to be made within 45 days of bid opening. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |