Similar Projects
Roanoke Airfield Pavement Rehabilitation
Bidding
Roanoke, AL 36274

Alexander City Runway Pavement Maintenance
Bidding
Alexander City, AL 35010

Improvements to Dothan Regional Airport
Post-Bid
Dothan, AL

Construction of Scottsboro Airport Apron Reconstruction
Post-Bid
Scottsboro, AL 35768

Corporate Hangar Apron Rehabilitation
Results
Less than $2,015,057 est. value
Birmingham, AL 35212

Reconstruct Runway 4-22 at the Tuscaloosa National Airport
Results
Tuscaloosa, AL 35401

Runway 1/19 Pavement Rehabilitation Project
Infrastructure
Bidding
Carrollton, AL

The Surface Rehabilitation of Airfield Pavement Located Between Taxiways A3 and A4
Post-Bid
Talladega, AL 35160

Taxiway Connector Relocation at Cullman Regional Airport
Results
Vinemont, AL 35179

Airfield Marking Application
Infrastructure
Bidding
Birmingham, AL 35212

Runway 14-32 Rehabilitation
Post-Bid
Mobile, AL 36615

Taxiway and Taxilane Seal Coat Surface Treatment
Results
Less than $490,000 est. value
Tanner, AL 35671

Runway 18/36 and Taxiway A Pavement Maintenance
Post-Bid
Foley, AL 36535

Pavement Maintenance - Runway 18/36 at Atmore Municipal Airport
Results
Less than $225,927 est. value
Atmore, AL 36502

Remark Runway 12/30 at Jeremiah A. Denton Airport
Post-Bid
Dauphin Island, AL 36528

Reported 05/14/2021 12:00 AM
Project Title

Taxiway Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Talladega, AL   (Talladega County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 04/20/21
Owner View project details and contacts
Architect View project details and contacts
Description

For work associated with the furnishing of all supervision, technical personnel, labor, materials, machinery, tools, equipment, incidentals, and services, including utility and transportation services, and the performance and completion of all work required for the rehabilitation of existing airfield pavement located between Taxiways A3 and northward to a line even with the north side of the airport`s large Maintenance Hangar (located southwest of the entrance to the airfield at the terminal`s security gate). This aforementioned is the Base Bid area for this project. An adjacent area (Add Alternate #1) will also be included in the bid process; it extends from the north end of the Base Bid area to the security gate, and westward along the Fuel Farm Taxiway to an area rehabilitated in 2017. However, work in this additive area will be awarded ONLY if funds are made available for the work. All work, regardless of area, will consist of the following: (1) cold milling/planning of existing asphalt pavement; (2) removal of raised pavement joints, resulting from pavement movement over the many decades that have passed since the original concrete pavement was constructed; (3) the cleaning, filling, and sealing of existing joints found within the limits of the concrete pavement found in the project area; (4) the removal and replacement of broken pavement, expected to be found in isolated areas of the existing pavement that is being rehabilitated; (5) the leveling of sunken areas of concrete pavement with hot mix asphalt pavement; (6) the application of an asphalt and stone surface treatment atop the prepared concrete pavement surfaces; (7) the application of a 2-inch hot mix asphalt overlay atop the surface treatment; and (8) the remarking/restriping of the pavement surface.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents