Similar Projects
Grandview Elementary Parking Lot
Bidding
Clarenceville, MI

Municipal Parking Lot #5 Outfall Repair
Post-Bid
Birmingham, MI

Lowe's Parking Lot Rehabilitation
Renovation
Post-Bid
Big Rapids, Canton, Fort Gratiot, Gaylord, Holland, Muskegon, Rochester Hills, Southgate, Sterling Heights, Warren, Ypsilanti, MI

Rest Areas and Welcome Centers Across the State
Term Contract
Results

Brewster Elementary Parking Lot 2019
Results
Less than $228,790 est. value
Rochester Hills, MI

BP 6 Birney Parking Lot and Track Field
Post-Bid
Southfield, MI 48076

Parking Lot 6 Rehabilitation
Results
Less than $642,864 est. value
Birmingham, MI

CDBG ADA Sidewalk Ramp Installation
Post-Bid
Milford, MI

Library Parking Lot Project
Results
Berkley, MI

2020 Safety Path Program
Post-Bid
MI

Parking Lot Reconstruction
Results
Less than $240,912 est. value
Beverly Hills, MI

Rest Area ADA Improvement Eastern Lower Peninsula
Post-Bid

OCC Southfield Parking Lot Repairs
Results
Southfield, MI 48075

Bike Racks for Sidewalks
Post-Bid
Wixom, MI

CDBG ADA Sidewalk and Ramp Installation
Results
$25,000 to $30,000 est. value
Milford, MI 48381

Last Updated 09/15/2020 01:39 PM
Project Title

2020 Safety Path Repair Program

Physical Address View project details and contacts
City, State (County) Bloomfield, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of repairing approximately 13,500 sft of existing concrete safety paths, ADA ramps/landings, and drive approaches at various locations throughout the Township. Miscellaneous curb, drainage improvements and other items may be included if involved with repairing the safety path. Year 1 also includes drainage improvements related to previously constructed safety path at several areas. Reference Divisions A, B, and C for Year 1 work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents