Similar Projects
Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Bidding
$16,200,000 est. value
CA

Construct Soldier Pile Wall
Infrastructure
Bidding
$1,750,000 est. value
CA

Compost Leachate Pond Improvements
Renovation
Post-Bid
$1,900,000 est. value
Auburn, CA 95603

Citywide Flood Protection Maintenance
Infrastructure
Post-Bid
Paso Robles, CA

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Z--Canal Construction, Repair And Replacement Indefinite Delivery / Indefinite Qua
Results

Roadway Excavation, Place HMA (Type A), and Alternative Pipe Culvert
Infrastructure
Bidding
$76,000,000 est. value
Olancha, CA

Repair Failing Slope
Infrastructure
Post-Bid
$275,400 est. value
CA

County Roadway Drainage Improvement Project
Infrastructure
Results
CA

Seventh Avenue Arrowhead Drive Road Improvement Notice Inviting Bids
Alteration
Bidding
Victorville, CA

Construct Unlined Ditch in Contra Costa County
Infrastructure
Post-Bid
$65,000 est. value
Hercules, CA 94547

Outfall Channel and Instrumentation Improvements
Infrastructure
Results
$4,180,435 est. value
San Jose, CA 95134

Construct Earth Retaining System with CIDH Pile and Structural Concrete
Infrastructure
Bidding
$1,970,000 est. value
CA

Columbia College Walkway Replacement Project
Renovation, Infrastructure, Alteration
Post-Bid
$100,000 est. value
Sonora, CA 95370

2020-21 Community Development Block Grant Project
Infrastructure
Results
$1,800,000 est. value
San Mateo, CA

Last Updated 09/27/2021 08:38 AM
Project Title

Upper Mormon Slough Critical Erosion Repair

Physical Address View project details and contacts
City, State (County) Escalon, CA 95320   (San Joaquin County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,387,900 to $6,136,214
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, consists of removing vegetation and trees, placing rock slope protection and seeding the banks. The work is located on the right and left banks of the Upper Mormon Slough, downstream of the Escalon-Bellota Road Bridge.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents