Similar Projects
Sumner & Newsome High School Additions
New Construction, Addition
Conception
Lithia, Riverview, FL 33579

New High School
New Construction
Conception
$48,616,107 est. value
Tampa, FL

Chamberlain HS Gymnasium, Field House & Sports Stadium Modifications
Renovation
Design
$5,200,000 est. value
Tampa, FL 33612

Freedom High School and Liberty Middle School
Renovation
Post-Bid
$13,200,000 est. value
Tampa, FL 33647

Alonso High School - Gymnasium & Stadium Turf Modifications
Renovation
Post-Bid
$1,371,294 est. value
Tampa, Tangelo Park, FL 33635

Continuing Service Contracts for Architectural Design and Construction Management Services
Term Contract
Results
Less than $4,000,000 est. value
Tampa, FL 33610

Chamberlain and Alonso High School - Gymnasium and Stadium Modifications
Renovation
Results
$10,200,000 est. value
Tampa, FL 33612

Spoto High School Classroom Addition
Addition
Construction
$9,500,000 est. value
Riverview, FL 33578

Robinson HS Referendum Year 3
Renovation
Construction
Tampa, FL 33616

Cambridge Christian School
New Construction - 45,000 SF
Pending Verification
Tampa, FL 33646

Spoto High School Addition
Addition - 31,013 SF
Conception
$16,058,922 est. value
Riverview, FL 33569

Kitchen Renovations at Multiple Sites
Renovation
Post-Bid
FL

2022 Referendum (Year 4) Projects
Renovation
Results
FL

PK-8 School UU
New Construction - 180,000 SF
Construction
Apollo Beach, FL 33572

New Sumner High School
New Construction - 260,389 SF
Conception
Riverview, FL 33579

Last Updated 06/22/2022 01:44 AM
Project Title

Coconut Palm K-8 Academy New 12-Classroom Addition

Physical Address View project details and contacts
City, State (County) Tampa, FL 33612   (Hillsborough County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

S/MBE Mandatory Subcontracting Goals: 5.63% Construction and 20% Local Work Force, within a County-wide radius. Mandatory M/WBE Subcontracting Goals: 14.37%- Non-minority women, African American, Native American and Asian American-owned firms Demolition, site work and addition to an educational facility in Princeton, Florida. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; and for site work for a educational facility. Coconut Palm K-8 Academy New 12-classroom Addition Award of the contract will be made to the lowest, pre-qualified responsible and responsive bidder for the actual amount bid considering base bid and accepted alternates (if any) as listed in the bidding documents. The Board will award the contract based upon the results of the tabulations as covered by applicable laws and regulations. Bidders desiring to participate in this solicitation must be pre-qualified by the Board prior to submitting their bid in response to this solicitation. Contact the Miami-Dade County Public Schools (M-DCPS) Office of Economic Opportunity at (305) 995-1307 or via email at oeo@dadeschools.net for information regarding Contractors' Pre-qualification procedures. QUESTIONS: Written questions regarding this project will be accepted. All written communications must be sent to the Project Architect/Engineer, Lourdes Rodriguez (lourdes@rodriguezarchitects.com), Rodriguez Architects, Inc., 2121 Ponce De Leon, Suite 1010, Coral Gables Miami, FL 33134. Questions will be accepted until 5:00 pm on Tuesday, April 26, 2022. Answers will only be issued to the Contractors who attended the mandatory Pre-bid Conference A Cone of Silence, pursuant to Board Policy 6325, shall commence with the issuance of this Legal Advertisement and shall terminate at the time the item is presented by the Superintendent to the appropriate Board committee immediately prior to the Board meeting at which the Board will award or approve a contract, reject all bids or responses, or take any other action that ends the solicitation and review process. Any violation of this rule shall be investigated by the Board's Inspector General and shall result in the disqualification of the potential applicant from the competitive solicitation process, rejection of any recommendation for award, or the revocation of an award to the vendor as being void, rendering void any previous or prior awards. The potential vendor or vendor's representative determined to have violated this rule, shall be subject to debarment. General questions regarding the legal advertisement will be sent to the Office of Capital Improvement Projects via email at ocip@dadeschools.net, and a copy filed with the Clerk of the School Board at celiarubio@dadeschools.net, who shall make copies available to the public upon request. Lobbyist Small/Micro, Minority/Women-Owned, and Veteran Business Enterprise Programs, Board Policy 6320.02 Coconut Palm K-8 Academy: S/MBE Mandatory Subcontracting Goals: 5.63% Construction and 20% Local Work Force, within a County-wide radius. The Board reserves the right to waive informalities and to reject any and all bids. Mandatory M/WBE Subcontracting Goals: 14.37%- Non-minority women, African American, Native American and Asian American-owned firms.

Details

Middle/Senior High School, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents