Similar Projects
Forgedale Road Bridge
New Construction, Demolition, Infrastructure
Design
$2,262,915 est. value
Wyomissing, PA

SR 4040 (Old Route 22) over Trib to Northkill Crk
Alteration
Design
$1,199,665 est. value
PA

2022 Road Work
Infrastructure
Bidding
$200,000 est. value
Cleona, PA 17042

2022 Road Work
Infrastructure
Bidding
$200,000 est. value
Cleona, PA 17042

SCTA Reading Operations Facility Sidewalk Replacement Project
Post-Bid
Reading, PA 19604

Road Improvement of Oil and Chip
Post-Bid
Elverson, PA

Access Control Point West Fort Indiantown Gap
Results
Annville, PA 17003

SR 2009 Resurfacing
Results
$2,500,000 to $4,999,999 est. value
PA

SR 4028 - Resurface
Alteration
Design
$1,000,000 est. value
Hamburg, PA 19526

2022 50/50 Sidewalk Repairs
Infrastructure
Bidding
$300,000 est. value
Wyomissing, PA

2021 Annual Paving Project
Term Contract
Post-Bid
Blandon, PA

2021 Roadwork
Results
Robesonia, PA

Lingle Road Reconstruct
Alteration
Design
$5,710,090 est. value
Palmyra, PA 17078

LVRT - 2022 Rehabilitation and Resurfacing
Infrastructure
Bidding
$400,000 to $525,000 est. value
Lebanon, PA

2021 Road Maintenance Project
Infrastructure
Post-Bid
Mohnton, PA 19540

Last Updated 07/06/2022 07:47 AM
Project Title

PA 419 Main Street Resurface

Physical Address View project details and contacts
City, State (County) (Berks, Lebanon Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,499,999
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of milling and overlaying the existing pavement, base repair, drainage improvements, ADA ramps, guide rail updates and other miscellaneous construction, as indicated on the approved drawings included in the bid package for State Route 419, Section 010, in Lebanon County, Millcreek Township from approximately intersection with Fort Zellers road at segment 0330 offset 0059 to approximately east of the Lebanon/Berks county line at segment 0012 offset 0515, for an overall project length of 8,170 linear feet(1.55 miles).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents