Last Updated | 04/27/2023 06:04 PM |
Project Title | Refinish 14 Gym Floors District Wide |
Physical Address | View project details and contacts |
City, State (County) | Bolivia, NC 28422 (Brunswick County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Athletic Facility |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $17,689 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | PROJECT DESCRIPTION: See Exhibit 1 for a detailed description of the project scope and requirements, and for school addresses. PROJECT SCHEDULE: The Contractor shall begin the work upon receipt of the Purchase Order, and expeditiously, with adequate forces, complete the work within the specified calendar days. The required milestone dates, and completion date are included in Exhibit 1. The contractor shall coordinate all work with Operations personnel to ensure minimal disruption to school activities. Should the Contractor fail to substantially complete the Work on or before the date stipulated for Substantial Completion, or such later date as may result from extension of time granted by Owner, he shall pay the Owner, as liquidated damages, the sum of One Hundred Dollars ($100.00) for each consecutive calendar day that terms of the contract remain unfulfilled beyond the date allowed by the Contract, which sum is agreed upon as a reasonable and proper measure of damages which the Owner will sustain per day by failure of the Contractor to complete Work within time as stipulated; it being recognized by the Owner and the Contractor that the injury to the Owner which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. TERMS AND CONDITIONS Brunswick County Schools Contract, included in Exhibit 2, is part of this Request for Bid and will govern this work. The selected contractor will be required to sign this contract. SCOPE OF WORK & SCHEDULE The contractor is responsible for all items required to complete the scope of services, those items being included in the scope of services even if not listed below. It is expected that the contractors will visit the school and observe actual conditions prior to placing their bid. The contractor's workmanship shall be equal to or exceed the workmanship of reputable contractors performing similar work in the Wilmington Metropolitan Service Area. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |