Similar Projects
Jacksonville Sports Complex
New Construction
Conception
Jacksonville, NC

Lee County Multi-Sports Complex
New Construction
Conception
NC

Multi-Sports Complex
New Construction
Design
$25,000,000 est. value
Sanford, NC 27332

Multi-Sports Complex
New Construction
Design
$25,000,000 est. value
Sanford, NC 27332

Multipurpose Indoor Sports Complex Project Funding
Post-Bid
NC

Ramsey - Basketball Locker Room Renovation
Renovation - 3,949 SF
Post-Bid
$860,000 CJ est. value
Cullowhee, NC 28723

Meekins Field Renovations Phase 2 and 3
Renovation
Results
Kill Devil Hills, NC 27948

Brodgen Hall Gymnasium Floor Structural Repairs
New Construction, Renovation, Demolition
Results
$1,500,000 est. value
Wilmington, NC

Jacob Cornsilk Community Complex
New Construction - 46,370 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Robbinsville, NC 28771

Elon University Baseball Clubhouse
New Construction, Addition - 10,170 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Elon, NC 27244

OT Sloan Park - Phase 2 - Lee County
New Construction, Renovation
Conception
$17,205,364 est. value
Sanford, NC 27330

Construction Manager at Risk for a Shop Facility and a Gymnasium
New Construction - 33,500 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Elizabeth City, NC

Dr. Raymond B Pennington Athletic Complex Field 6 Scoring Tower
New Construction
Results
Lumberton, NC 28358

East Lee Middle School New Gym and Renovations - Lee County
New Construction, Renovation, Infrastructure
Conception
$5,460,000 CJ est. value
Sanford, NC 27332

General Contracting Services - Pink Hill Gymnasium
Renovation
Post-Bid
$299,000 est. value
Pink Hill, NC 28572

Last Updated 04/27/2023 06:04 PM
Project Title

Refinish 14 Gym Floors District Wide

Physical Address View project details and contacts
City, State (County) Bolivia, NC 28422   (Brunswick County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $17,689 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

PROJECT DESCRIPTION: See Exhibit 1 for a detailed description of the project scope and requirements, and for school addresses. PROJECT SCHEDULE: The Contractor shall begin the work upon receipt of the Purchase Order, and expeditiously, with adequate forces, complete the work within the specified calendar days. The required milestone dates, and completion date are included in Exhibit 1. The contractor shall coordinate all work with Operations personnel to ensure minimal disruption to school activities. Should the Contractor fail to substantially complete the Work on or before the date stipulated for Substantial Completion, or such later date as may result from extension of time granted by Owner, he shall pay the Owner, as liquidated damages, the sum of One Hundred Dollars ($100.00) for each consecutive calendar day that terms of the contract remain unfulfilled beyond the date allowed by the Contract, which sum is agreed upon as a reasonable and proper measure of damages which the Owner will sustain per day by failure of the Contractor to complete Work within time as stipulated; it being recognized by the Owner and the Contractor that the injury to the Owner which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. TERMS AND CONDITIONS Brunswick County Schools Contract, included in Exhibit 2, is part of this Request for Bid and will govern this work. The selected contractor will be required to sign this contract. SCOPE OF WORK & SCHEDULE The contractor is responsible for all items required to complete the scope of services, those items being included in the scope of services even if not listed below. It is expected that the contractors will visit the school and observe actual conditions prior to placing their bid. The contractor's workmanship shall be equal to or exceed the workmanship of reputable contractors performing similar work in the Wilmington Metropolitan Service Area.

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents