Similar Projects
1st and Forest Stormwater Project
Infrastructure
Bidding
Windermere, FL 34786

Desilt and Video
Infrastructure
Bidding
$501,342 est. value

Keystone Drive Nutrient-Separating Baffle Box and Upflow Filter Water Quality Improvement Project
Post-Bid
Less than $862,000 est. value
Orlando, FL 32806

Downtown Master Stormwater Pond and Park
Infrastructure
Post-Bid
$6,000,000 est. value
Ocoee, FL

Storm Sewer Slip Lining Rehabilitation
Results
Less than $10,544,370 est. value
Orlando, FL 32801

NTC Orlando Storm and Sanitary Improvement
Results
Less than $341,000 est. value
Orlando, FL 32827

39th Street Pond Weir Repair
Infrastructure
Bidding
$100,000 est. value
FL

Storm Drain Video Inspection Services at Various Locations along Florida`s Turnpike System
Term Contract
Post-Bid
Deerfield Beach, Homestead, Middleburg, Orlando, Tampa, Wildwood, FL

Storm Line Rehabilitation Cleaning and Video Recording
Term Contract
Results
Orlando, FL 32802

Stormwater Infrastructure Rehabilitation Services
Infrastructure
Bidding
$4,705,690 est. value
FL

B-14 Boggy Creek Pipeline Improvements (Segment C)
Results
Less than $1,100,000 est. value
Orlando, FL 32832

Desilt and Video and Pipe Lining
Results
Less than $600,000 est. value

Storm Sewer Desilt and Video
Results
Less than $600,000 est. value

Stormwater Pipe Install and Repair
Term Contract
Results
Less than $15,843,601 est. value
Orlando, FL 32801

Stormwater System Desilt and Video
Results
Less than $1,377,500 est. value
FL

Reported 09/21/2021 09:47 AM
Project Title

Cured in Place Pipe for Stormwater Pipe Rehabilitation

Physical Address View project details and contacts
City, State (County) Belle Isle, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Including but not necessarily limited to labor, supervision, traffic control, materials, equipment, installation, onsite material test samples showing compliance with manufacturer’s recommended material, handling and incidentals required for the rehabilitation of various sized stormwater mains with resin impregnated cured-in-place pipe

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents