Similar Projects
Saint Andrew School Site Improvements
Renovation
Conception
Middletown, DE 19709

Two New Interconnected Middle Schools
Design
Less than $115,670,000 est. value
Dover, DE

Ursuline Academy Parking Lot Addition
New Construction, Renovation
Design
Wilmington, DE 19806

Toilet Room Renovation at Mount Pleasant High School
Renovation, Demolition
Bidding
Wilmington, DE 19809

Cape Henlopen High School Band Room Renovation
Renovation
Bidding
Lewes, DE 19958

Construction Management Services - Appoquinimink School District
Post-Bid
Odessa, DE 19730

NHS Auditorium Renovations
Renovation
Post-Bid
Less than $1,043,900 est. value
Newark, DE 19711

Delaware State Fire School Building – Bathroom Renovations
Renovation
Results
Dover, DE 19904

CSD - MSHA Health Science Lab Renovations
Renovation
Results
Bear, DE 19701

Cape Henlopen High School Additions
Addition
Construction
Lewes, DE 19958

Appoquinimink School District – Everette Meredith Middle School
New Construction, Demolition - 83,000 SF
Construction
Middletown, DE 19709

NHS Auditorium ADA Renovations
Renovation
Bidding
Newark, DE 19711

Christiana High School – AG Science Room Renovations
Renovation
Post-Bid
Less than $2,249,000 est. value
Bear, Newark, DE 19713

Brandywine High School Renovations Phase III
Renovation
Results
Wilmington, DE

Howard T Ennis School – New Special Needs School
New Construction - 94,500 SF
Construction
Less than $45,000,000 est. value
Georgetown, DE 19947

Reported 04/08/2021 03:51 PM
Project Title

New Construction of Capital Middle School

Physical Address View project details and contacts
City, State (County) State-Wide: DE
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced March 2021, Construction Completion Expected third quarter 2023
Bids Due View project details and contacts
Estimated Value $11,567,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project involves new approx. 235,000 sq.ft. Interconnected Middle Schools with associated site improvements. This is a construction management project. Bids are to be for the following contracts: A-1: Site Work A-12: Caulking/Painting A-2: Concrete Work A-13: Casework A-3 Masonry Work A-14: Kitchen Equipment A-4: Steel Work A-15: Mechanical A-5: Carpentry & General Work A-16: Sprinkler System A-6: Roofing Work A-17: Electrical A-7: Furnish Hollow Metal/Doors/Hardware A-18: Wall Panels A-8: Aluminum Storefront/Windows/Glass & Glazing A-19. Structured Cabling A-9: Drywall/Metal Stud A-20: Classroom A/V Systems A-10: Acoustical Work A-21: Specialized A/V Systems A-11: Floor Covering Work

Details

Division 02 - Existing Conditions, Demolition, Structure Demolition.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents