Similar Projects
Reported | 10/30/2020 12:00 AM |
Project Title | Engineering Design Contractor for Bear Creek Floodplain Analysis, Greenbelt Rail Infrastructure Design and Federal Permitting |
Physical Address | View project details and contacts |
City, State (County) | Lakewood, CO 80226 (Jefferson County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project scope includes four specific project areas in addition to the replacement of approximately 9,515 LF of 8'-wide concrete path with 10'-wide concrete path, and 14,000 LF of 6'-wide crusher-fines side trail through City open space between Wadsworth Blvd and the Fox Hollow Golf Course. The four specific projects are the replacement of 2 pedestrian bridges, improvements at the Estes St. underpass, and the widening of 950' of concrete path on a narrow causeway adjacent to the creek. Expertise is required in surveying, floodplain analysis, structural engineering, trail design, environmental investigations, construction drawings, temporary erosion and sediment control, technical specifications, construction cost estimation, wetland mitigation and environmental and floodplain permitting. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |