Similar Projects
Heritage Place Mixed Use
New Construction
Design
Naperville, IL 60540

KLA Childcare Facility
New Construction, Renovation - 12,824 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Naperville, IL 60564

Swing Set Installation at Ollman Park
Renovation
Bidding
Glendale Heights, IL 60139

Armstrong Park Hub Playground - Synthetic Playground Turf Installation
Post-Bid
Carol Stream, IL 60188

Camera Park Improvements
Post-Bid
Glendale Heights, IL 60139

DuPage Highlands Park Development
Results
Winfield, IL 60190

Dorothy Drennon Park
Renovation
Results
Oakbrook Terrace, IL 60181

The Oak Brook Commons Mixed Use
New Construction
Construction
$500,000,000 est. value
Oak Brook, IL 60523

Mall of India Childcare Center
Build-Out, Alteration
Pending Verification
Naperville, IL 60540

Mall of India Childcare Center
Build-Out, Alteration
Pending Verification
Naperville, IL 60540

Playground Improvements at Nordic Park
Renovation
Bidding
Medinah, IL

Four Seasons Park
Post-Bid
Lombard, IL

East Street Park Ball Field Renovation
Results
Winfield, IL 60190

Presidents Playground Equipment
Post-Bid
Wheaton, IL

Riverwalk Park Phase I
Results
Winfield, IL 60190

Reported 08/10/2021 09:44 AM
Project Title

KLA School

Physical Address View project details and contacts
City, State (County) Naperville, IL 60564   (DuPage County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Park/Playground, Pre-School/Daycare
Contracting Method
Project Status Obtained from a News Source
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Private pre-school and daycare center.

Details

,, 21,824 SF - Pre-School/Daycare, 12,824 SF Build-Out, Park/Playground, 9,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Selective Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents