Similar Projects
P197 DB Aircraft Maintenance Hangar, MCAS Cherry Point, NC
New Construction
Bidding
$181,430,000 est. value
Cherry Point, NC

Partial Parallel Taxiway Runway 23 and Runway 5
Infrastructure
Bidding
Lumberton, NC 28358

Clt Concourse A Expansion - Phase 2
Addition - 191,000 SF
Sub-Bidding
$138,500 est. value
Charlotte, NC 28263

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Design-Build for Smith Reynolds Airport Quonset Hangar Renovations
Renovation
Post-Bid
Winston-Salem, NC 27105

Runway 18C/36C Joint Sealant Replacement, Spall Repairs and Taxiway Shoulder Repair
Results
Charlotte, NC

Taxiway Shoulder Pavement Rehabilitation Phase I
Results
Charlotte, NC 28202

Blue Line Aviation
New Construction
Pending Verification
Smithfield, NC

On-Airport Obstruction Removal
Infrastructure
Bidding
Salisbury, NC 28147

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

New Corporate Taxilane and Corporate Hangar Phase 1 Site Preparation
Results
Greenville, NC 27834

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Runway 10 Safety Area Improvements Project
Results
Statesville, NC 28677

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

North Hangar Development
Results
NC

Reported 10/27/2021 12:00 AM
Project Title

T-Hangar and Hangar Taxilanes Site Preparation and Paving

Physical Address View project details and contacts
City, State (County) Burlington, NC   (Alamance County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Aircraft Hangar, Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project shall consist of furnishing all labor, materials, and equipment and performing all work required to satisfactorily complete the T-Hangar and Hangar Taxilanes Site Preparation and Paving project. Items of work include erosion control, clearing and grubbing, earthwork, aggregate base course, bituminous paving, marking and drainage items.

Details

Aircraft Hangar, New Construction.
Division 03 - Concrete, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 13 - Special Construction, Fabricated Engineered Structures, Metal Building Systems.
Division 21 - Fire Suppression.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Base Courses, Aggregate Base Courses, Flexible Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Storm Drainage Utilities.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents