Similar Projects
HVAC/Boys and Girls Club
Bidding
Moline, IL 61265

Community Housing Services Program HVAC and Plumbing
Bidding
Moline, IL 61265

Heat Treat Furnace - RIPD E4000-20-9-31
Post-Bid
Rock Island, IL 61299

HVAC Services
Post-Bid
Peoria, IL 61600

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

2020 HVAC Replacement
Results
Wheeling, IL 60090

D128 Summer HVAC Upgrades at Libertyville HS
Bidding
Libertyville, IL 60048

L/A HVAC Testing and Balance
Post-Bid
Peoria, IL 61635

Replace Chiller
Results
$1,000,000 to $1,400,000 est. value
Elgin, IL 60123

HVAC Air Filters- District Wide
Term Contract
Bidding
Algonquin, IL

HVAC Preventative Maintenance for Lake County Public Works Facilities and the City of Waukegan
Term Contract
Post-Bid
Libertyville, Waukegan, IL 60048

Sports and Recreation Center HVAC Replacement
Results
De Kalb, IL 60115

HVAC Upgrades
Renovation
Bidding
Chicago, IL 60605

FSCC Chiller Maintenance
Post-Bid
Chicago, IL 60608

2020 TPPS Air Conditioning Units Replacement
Results
Tinley Park, IL 60451

Last Updated 12/15/2020 11:53 AM
Project Title

Richmond-Burton Community High School Chiller Replacement

Physical Address View project details and contacts
City, State (County) Richmond, IL 60071   (McHenry County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $724,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes: Replacement of existing chillers and chilled water pumps, including modifications to associated chilled water piping, electrical connections, BAS controls, concrete pads, and fence enclosure. 1. Sitework: Rough and finish grading, concrete sidewalks and equipment pads, grass turf restoration. Fencing at equipment enclosures. 2. Mechanical Systems Cooling including piping, piping insulation, chillers, and pumps. Equipment demolition. 3. Electrical Systems Electrical demolition. Power connections to new equipment, including distribution panel modifications.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 07 - Thermal and Moisture Protection, Joint Sealants.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Hydronic Piping and Pumps, HVAC Air Distribution, Packaged Water Chillers, Rotary-Screw Water Chillers, Central HVAC Equipment.
Division 26 - Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Low-Voltage Controllers, Enclosed Controllers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents