Similar Projects
RFP Design / Engineering - Public Safety Building Addition and Improvements
Addition, Demolition, Infrastructure, Renovation
Bidding
$1,300,000 CJ est. value
Altoona, WI 54720

RFP Design / Engineering - Public Safety Building Addition and Improvements
Addition, Demolition, Infrastructure, Renovation
Bidding
$1,300,000 CJ est. value
Altoona, WI 54720

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

National Architecture/Engineering/Interiors (IDIQ) Contract
Results
Less than $25,000,000 est. value

Design Work for City Wells/Groundwater PFAS Mitigation/Treatment
New Construction, Infrastructure
Post-Bid
Eau Claire, WI

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Police Department Remodel
Renovation
Results
Altoona, WI

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Last Updated 03/23/2023 12:57 PM
Project Title

DSP Eau Claire Post HVAC Replacement and Addition of DDC - Wisconsin Department of Transportation (WisDOT)

Physical Address View project details and contacts
City, State (County) Eau Claire, WI 54701   (Eau Claire County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Schematic Drawings, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $475,600 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 23, 2023, an engineer has been selected. A firm timeline for stage of design and construction has not been determined. *The closed solicitation has been included below for reference: Select an A/E consulting firm to prepare Preliminary Design Documents, including a Design Report for the repair to the DMV's concrete driveway. This project will replace three existing air handling units, three A/C condensing units, two boilers, and all necessary fittings, refrigeration lines, and related piping. It will also convert the current pneumatic control system to direct digital controls (DDC), allowing for remote monitoring and management. The existing ductwork serving the dispatch area will be replaced as will two first floor restroom exhaust fans. The HVAC system at the Eau Claire State Patrol Post is beyond its useful life and has airflow issues in the dispatch room making it difficult to maintain proper temperatures. Additionally, the Post's DDC is limited to two air handling units which serve less than half of the Post. Upgrading the DDC to cover the entire facility will allow HVAC/R technicians to have remote access to all conditioning equipment and will further DOT's goal of having DDC installed in all DOT-owned facilities. DOT originally received a quote of $268,000 for construction however DFD requested an increase to $360,000 due to the current and future bidding environment. The A/E design team selected for this project shall have experience in planning, design, and construction of public use facilities. A/E Selection Jul 2022 Design Report Jan 2023 SBC Approval Feb 2023 Bid Opening Apr 2023 Start Construction Jun 2023 Substantial Completion Dec 2023 Final Completion Feb 2024 The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents