Similar Projects
Last Updated | 03/21/2023 11:47 AM |
Project Title | Schurz High School (HS) - ACM and LBP Abatement Environmental Contractors |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60641 (Cook County) |
Category(s) | Single Trades |
Sub-Category(s) | Environmental |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $23,999 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Schurz HS - ACM and LBP Abatement - Environmental Contractors (for abatement jobs only) 99% of work driven by MEC. Department: Pre-Qualified Contractor Opportunities Questions Due Date: Feb 21st 2023, 2:30 PM CST Provide Labor and Materials: ACM Abatement LBP Abatement 1) ACM and LBP Abatement in Room 115 2) ACM and LBP Abatement in Room 111/113 3) ACM and LBP Abatement in Room 313 4) Contractor to secure necessary permits. 5) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 6) Not responsible for contractor errors as a result of non-field verification. 7) Materials and installation must comply with CPS Standards and Specifications as listed on a) Section 01 56 11: General Dust, Fume and Odor Control b) Section 02 86 13: Hazardous and Universal Waste Management 8) Secure job site overnight if work is not completed in one day. 9) If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. 10) Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. 11) All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. 12) Contractor is to remove and dispose of materials torn out and any construction debris. 13) All trash must be removed off-site by contractor. 14) Clean the surrounding area and make sure all is swept of debris. 15) All questions/requests must be received two (2) business days prior to bid closing |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |