Similar Projects
Precast Concrete Pavement, Electronic Toll System, JPCP, CB and Structural Concrete
Infrastructure
Bidding
$170,000,000 est. value
Esparto, CA 95679

Storm Damage Repair to Briceland Thorne Road
Infrastructure
Bidding
$201,312 est. value
Garberville, CA 95542

Traffic Signal and Streetlight Maintenance Services
Infrastructure
Post-Bid
Livermore, CA

Traffic Signal & Street Lighting Equipment
Infrastructure, Alteration
Post-Bid
Long Beach, CA 90899

Provide And Install Traffic Signal Controller Cabinets
Infrastructure
Results
Sunnyvale, CA

Real-Time Traffic Flow Monitoring
Infrastructure
Results
Less than $500,000 est. value
Stockton, CA

Traffic Signal Modification at the intersection of Hancock Avenue and Milkwood Lane/Leafwood Drive
Infrastructure
Bidding
$232,000 est. value
Murrieta, CA 92562

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Campus Wayfinding and Signage Plan
Alteration
Results
La Verne, Walnut, CA 91789

Old Topanga Canyon Road / Mulholland Highway Improvements Project
Infrastructure
Bidding
$3,000,000 est. value
Calabasas, CA 91301

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

Modify Traffic Monitoring Stations
Infrastructure
Results
$1,510,000 est. value
CA

Cordova Street Enhancements Project
Infrastructure
Bidding
$4,500,000 to $5,500,000 est. value
Pasadena, CA 91199

Asphalt Rubber Cape Seal and Traffic Calming Project
Infrastructure
Post-Bid
$500,000 est. value
Suisun City, CA 94585

Traffic Signal At Lake Isabella Boulevard And Elizabeth Norris Road
Infrastructure
Results
$754,768 est. value
Lake Isabella, CA 93240

Last Updated 06/03/2022 01:38 AM
Project Title

Citrus Avenue at Ceres Avenue Traffic Signal Project

Physical Address View project details and contacts
City, State (County) Fontana, CA 92335   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $720,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The general items of work to be done consist of installing traffic signal and lighting poles, mast arms, fiber optic interconnect, emergency vehicle detectors, battery back-up system, control assemblies, pull boxes, pole foundations, conduit undergrounding, detectable warning surface installation, slurry sealing, signing and striping, as well as restoring all improvements to preconstruction conditions, and all other related work required as indicated on the project plans for the Citrus Avenue at Ceres Avenue Traffic Signal Project.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents