Similar Projects
127Eaw22r0025 - Stanislaus Multi CG Well Water System
Term Contract
Design
$250,000 to $500,000 est. value
CA

Upgrade and Repair Three Existing Pump Plants
Infrastructure
Bidding
$5,500,000 est. value
CA

Water Treatment Plant Backwash and Recycled Water Capacity Project
Infrastructure
Bidding
$1,400,000 est. value
Folsom, CA 95630

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Treated Water Booster Pumps
Alteration
Results
CA

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Construction
Anaheim, CA

EWWTP Well 3 Drilling
Term Contract
Bidding
Elmira, CA 95625

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Storm Water Pump and Motor Maintenance Services
Term Contract
Bidding
Mill Valley, San Rafael, Tiburon, CA 94941

Well and Pump Maintenance and Repair
Infrastructure
Post-Bid
$114,000 est. value
Napa, Suisun City, CA 94585

Chilled Water Pump Project
Infrastructure
Results
Marysville, CA 95901

Storm Water Drain Water Pump Services
Infrastructure
Bidding

Last Updated 03/22/2022 10:59 AM
Project Title

Streamgage Removal

Physical Address View project details and contacts
City, State (County) Santa Barbara, Wheeler Springs, CA (Santa Barbara, Ventura Counties)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Geological Survey needs a contractor to dismantle and remove abandoned stilling well structures at two sites. This would involve safe removal of securing braces, equipment shelter, stilling well, decking, railings, bolts and anchor points, and scrap taken off site for recycling.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents