Similar Projects
Last Updated | 05/16/2023 11:07 AM |
Project Title | Automated Meter Reading(AMR) Improvements |
Physical Address | View project details and contacts |
City, State (County) | Ashburn, GA 31714 (Turner County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $48,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | GEFA NO.: DW2020005 The work to be done shall consist of furnishing all labor, materials, and equipment necessary to construct the proposed AMR Project as described in the contract documents and specification. In general, construction consists of retrofitting or replacing approximately 2400 existing water meters, and installation of transmitters, collectors, hardware, software, and training for automate meter reading system. Collection System must be capable of integrating gas meters in the system (future). All bid forms must be accompanied by a Bid Bond in an amount not less than 10% of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond and Payment Bond, each in the amount of 100% of the Contract amount. All bonds must appear on the Treasury Departments most current Circular 570 Listing. The Owner reserves the right to reject any or all bids, to waive informalities, and to re-advertise. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |