Similar Projects
Roof Replacement - Chapel School
Alteration
Bidding
Stratford, CT 06614

Fannie Beach Center Roof Project
Alteration
Bidding
Milford, CT 06460

Siding - 22 Colt Street
Post-Bid
East Hartford, CT

Partial Roof Replacement at Saxe Middle School
Post-Bid
New Canaan, CT 06840

Norwalk Roof and HVAC Department of Motor Vehicles Branch Office Facility
Results
$831,343 to $875,097 est. value
Norwalk, CT 06851

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Library Franklin Building Exterior Facade Restoration
Construction
Greenwich, CT

Roof Replacement - Wooster Middle School
Alteration
Bidding
Stratford, CT 06614

Reroofing and Related Work Myrtle H. Stevens School
Post-Bid
Rocky Hill, CT 06067

Entry Stair Reconstruction at Rocky Hill High School
Results
$350,000 est. value
Rocky Hill, CT 06067

River Baldwin Recreation Center Roof Replacement
Alteration
Bidding
Waterbury, CT 06706

Harry M. Bailey Middle School Partial Roof Replacement
Post-Bid
West Haven, CT 06516

Public Works Facility Roof Project
Results
Less than $188,129 est. value
Moosup, CT

Hartford Facility Roof Patch
Post-Bid
Hartford, CT 06120

Roof Replacement at East School
Results
New Canaan, CT 06840

Last Updated 10/18/2021 12:36 PM
Project Title

The Kate Gutters

Physical Address View project details and contacts
City, State (County) Old Saybrook, CT 06475   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior, Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. Obtain a building permit. ? Supply all required staging and/or equipment required to perform aerial work. 2. Install temporary fencing around equipment and work area to protect pedestrian traffic around the building. 3. Remove five courses of slate including the starter slates and save for re-use. Contractor is responsible for providing new slate (similar in color, size, and thickness) to replace any that may be damaged during the existing slate’s removal. 4. Remove the existing half-round Rheinzink gutters, gutter straps, and downspouts. 5. Inspect the roof deck to ensure it is properly secured to existing rafters. 6. Install one row (3 feet) of high temperature ice and water barrier to the gutter edge of the roof. 7. Fabricate and install a 20 oz. lead coated copper flanged gutter to match the attached profile and dimensions. 8. Install 1/8” copper bar stock continuously along the top outside edge of the gutter and twisted, roof mounted, 1/8” copper bar stock hangers spaced 16” on center. 9. Secure hangers to gutter using brass nuts and bolts and washers. 10. All seams in gutters should be lapped a minimum of 1.5 inches and should have two rows of copper rivets; staggering each rivet by 1.5” inches.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents