Similar Projects
Supply of Drainage Pipe
Post-Bid
Woonsocket, RI

High Density Polypropylene Pipe
Term Contract
Post-Bid
Warwick, RI

Installation of Drainage City Wide
Term Contract
Results
Woonsocket, RI

Route 1 Post Road Drainage
Results
North Kingstown, RI 02852

Retaining Wall Replacement
Infrastructure
Post-Bid
Woonsocket, RI

Drilling IDIQ In Massachusetts and Rhode Island
Results

Sidewalk, Road, and Drainage Construction
Infrastructure
Post-Bid
Central Falls, RI

Walley Beach and Halsey Herreshoff Park Seawall Restoration
Results
RI

Frames, Grates, and Covers
Term Contract
Post-Bid
Warwick, RI

Drainage Improvements - Scituate High School
Results
Scituate, RI 02857

Tanyard Brook Culvert Replacement Phase III Project
Infrastructure
Post-Bid
Bristol, RI 02809

Drainage, Precast Concrete Curb, Retaining Wall Materials
Infrastructure
Results
Wakefield, RI 02876

Buckeye Brook Restoration Project
Infrastructure
Post-Bid
Warwick, RI 02886

Riverview Avenue Drainage Improvements
Infrastructure
Results
Westerly, RI 02891

Fox Hill Avenue Drainage Improvements Project
Infrastructure
Post-Bid
$400,000 est. value
Bristol, RI 02809

Last Updated 06/23/2022 05:11 AM
Project Title

Drainage Improvements at Colt Andrews School

Physical Address View project details and contacts
City, State (County) Bristol, RI 02809   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents