Similar Projects
SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Conception
$735,000 CJ est. value
Toppenish, WA 98948

SR 241 / Allen Rd Intersection - Intersection Safety
Infrastructure
Conception
$677,000 CJ est. value
Sunnyside, WA 98944

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

SR 410/Rock Creek Vic - Chronic Environmental Deficiency
Infrastructure
Design
$3,562,000 CJ est. value
Naches, WA 98937

Yakima River at Union Gap Ecosystem Restoration Project
Infrastructure
Bidding
$25,000,000 CJ est. value
Yakima, WA 98901

Robertson Elementary School Safety Improvements - Rebid
Infrastructure
Bidding
$492,780 CJ est. value
Yakima, WA 98902

Construction of the Transportation Cooperative
New Construction, Infrastructure
Post-Bid
$7,570,000 CJ est. value
Selah, WA 98942

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Results
$228,286,585 CJ est. value
Kirkland, WA 98033

Collection System Improvements - Phase 1
Infrastructure
Results
$1,204,118 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Childrens Village Expansion
Addition, Infrastructure, Renovation - 11,000 SF
Pending Verification
$6,400,000 CJ est. value
Yakima, WA 98902

US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

US 12/White Pass Vicinity - Culvert Lining
Infrastructure
Design
$689,000 CJ est. value
Yakima, WA 98901

RFP - Central Business District Housing Development Project
New Construction, Infrastructure
Bidding
Yakima, WA 98901

Last Updated 12/05/2022 06:51 PM
Project Title

White Swan Lift Station Improvements

Physical Address View project details and contacts
City, State (County) White Swan, WA 98952   (Yakima County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected January 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Plan Holders
Owner View project details and contacts
Architect View project details and contacts
Description

Work is to be completed to in the community of White Swan, under the jurisdiction of the Yakama Nation. The contractor must review site conditions, and report any concerns or discrepancies to the Contracting Officers Representative (COR) in writing prior to beginning construction. In accordance with the Drawings and Technical Specifications (Attachments 1 and 2), the work requirements include: Work Requirements: Install Temporary Sewer Bypass System Remove pumps, piping, fittings, valves, flow meter, concrete flat top slabs, electrical wiring and panels, and appurtenances as described in the Design Install new pumps, piping, fittings, valves, flow meter, precast concrete flat top slabs, electrical wiring and panels, and appurtenances as described in the Design Install chain link fencing as specified in the Design *Amendment 1,2, 3 and 4 have been released.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents