Similar Projects
Wellborn Cabinet Expansion / Oxford
Demolition, New Construction, Infrastructure - 250,000 SF
Design
$17,000,000 CJ est. value
Lincoln, AL 35096

Asphalt Resurfacing
Infrastructure
Post-Bid
Talladega, AL 35160

Demolition of Existing Pool Area and Site Development for New Splash Pad
Demolition, Infrastructure
Post-Bid
Sylacauga, AL 35150

Constructing the Access Management (Grading, Drainage, Pavement, and Traffic Stripe)
Infrastructure
Results
$1,927,747 to $2,356,135 est. value
Sylacauga, AL

Constructing The Micro-Milling, Guardrail Installation, Resurfacing, And Traffic Stripe On Sr-77 From The Junction Of Cr-414 To The i-20 Overpass (Mp 75.941) In Lincoln
Infrastructure
Results
$854,690 to $1,044,622 est. value
AL

Paving Projects at Indian Valley Elementary School, Pinecrest Elementary School, Nichols-Lawson Middle School and Sylacauga High School
Infrastructure
Post-Bid
Sylacauga, AL 35150

Constructing the Safety Widening, Planing, Resurfacing, Bridge Rail Retrofit, Guardrail Installation, and Traffic Stripe on SR-275/SR-21 from 0.150 mile south of the intersection of Shocco Springs Road in Talladega to 0.390 mile north of the junction of CR-91/CR-321 (Stockdale Road)
Infrastructure
Results
$8,301,912 to $10,146,781 est. value
AL

Concrete Street Repairs
Infrastructure
Post-Bid
Sylacauga, AL

2022 Wastewater Treatment Plant Improvements
Renovation, Infrastructure
Results
$1,667,000 CJ est. value
Lincoln, AL 35096

Priebes Mill Road Water Main Extension (nr)
Infrastructure
Post-Bid
$400,000 CJ est. value
Oxford, AL 36203

East Street North Pocket Park
Infrastructure
Results
$700,000 CJ est. value
Talladega, AL 35160

Addition and Renovations to Cafeteria at Salter Elementary School
Addition, Demolition, Renovation, Infrastructure
Post-Bid
$480,000 CJ est. value
Talladega, AL 35160

Paving for Talladega County Central High School
Infrastructure
Post-Bid
$662,000 CJ est. value
Talladega, AL 35160

Hickory Street Ditch Rehabilitation
Infrastructure
Post-Bid
$200,000 CJ est. value
Sylacauga, AL 35150

Willman Road Culvert Replacement Project
Infrastructure
Post-Bid
$300,000 CJ est. value
Talladega, AL 35160

Last Updated 11/30/2022 02:05 PM
Project Title

NASCAR Speedway Commerce Center Business Park / Lincoln

Physical Address View project details and contacts
City, State (County) Lincoln, AL 35096   (Talladega County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Conceptual Design, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $640,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 30, 2022, the developer continues to market the land, but no construction projects have been scheduled in the immediate future. A firm construction timeline has not been determined.

Details

3,000,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents