Similar Projects
Roosevelt High School Replacement of Ceiling and Lights - Phase II
Alteration
Post-Bid
Yonkers, NY 10710

Sunmount DDSO, Reinsulation of Basements/Crawlspaces and Asbestos Abatement
Alteration
Post-Bid
$24,000 to $3,000,000 est. value
Tupper Lake, NY 12986

Cortland ECSD 2021/22 Capital Outlay Project
Alteration
Results
Cortland, NY 13045

IPE Decking
Term Contract
Results
Hempstead, NY

Reconstruction of Primary Tanks, Wards Island Waste Water Treatment Plant
Renovation
Construction
$123,296,000 CJ est. value
New York, NY 10035

Jamestown Public Schools Capital Project Phase 1 at Fletcher Elementary, Technical Academy and Bus Garage - BP-02 General Trades
Renovation
Construction
$11,000,000 CJ est. value
Jamestown, NY 14701

Light Interior Construction at (2) Fire Stations
Alteration
Post-Bid
Saratoga Springs, Wilton, NY 12831

LRRT - University Station Escalator Tube Panel Liner Replacement
Alteration
Results
$850,000 est. value
Buffalo, NY 14214

New York Racing Association Interior Decor & Services
Alteration
Post-Bid
Elmont, NY 11003

Site, Interior, and Window Reconstruction at Hampton Bays High School
Alteration
Results
Hampton Bays, NY 11946

Bond Phase 2 at John F. Kennedy Middle School.
Renovation
Post-Bid
$100,000 CJ est. value
Bethpage, NY 11714

Operating Room Scrub Sinks
Alteration
Results
Brooklyn, NY 11203

Cuyler Bathroom Design
Alteration
Post-Bid
Less than $50,000 est. value
Newark, NY 14513

Demountable Walls
Alteration
Results
Centereach, NY

Annual Requirements Contract - Ceiling Tiles and Support Components
Term Contract, Alteration
Post-Bid
Yaphank, NY

Last Updated 08/28/2023 12:13 PM
Project Title

Chestnut IRA Kitchen Renovation

Physical Address View project details and contacts
City, State (County) New Windsor, NY 12553   (Orange County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 30 days of award. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each work day. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of project, before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with Plant Superintendent. SCOPE OF WORK includes, but is not necessarily limited to the following: 1. Remove existing Countertops and Cabinets 2. Dishwasher and Stove to remain. If either needs to be temporarily removed, it is contractor's responsibility to disconnect and reconnect/reinstall 3. Laminate countertops to be replaced with Quartz countertops 4. Replace sink with 25" Elkay stainless steel single basin sink with 8" depth. Install new basket strainer. 5. Existing faucet to be replaced with Delta Foundations 21988LF-SS faucet 6. Cabinets to be replaced with stained oak plywood cabinets with raised panel non- mitered doors to specifications listed on attached layout. Stain colors to be determined by DDSO staff and vendor after project has been awarded. 7. Tile backsplash to be removed and replaced with 1/4" solid surface wall cladding panel in subway tile pattern(Corian interior vertical cladding or equivalent). Crown molding and panels to be replaced in kind 8. 9. Microwave range hood to be removed and replaced in kind, and vented out of the house 10. Replace existing electrical receptacles and backplates with new pieces in white. 11. Sink, faucet, basket strainer, and microwave range hood will be supplied by HVDDSO Service-Disabled Veteran-Owned Set Aside: No Contract term: Within 30 days of receiving the purchase order

Details

Division 09 - Finishes.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents