Similar Projects
Last Updated | 09/08/2022 08:03 PM |
Project Title | Bid Package #10 SCVMC Old Main Hospital Building Demolition and Rebuild - Phase 1, 2, 3 (partial), 4 (partial), 5, Utilities, Sitework |
Physical Address | View project details and contacts |
City, State (County) | San Jose, CA 95128 (Santa Clara County) |
Category(s) | Heavy and Highway, Medical |
Sub-Category(s) | Hospital, Site Development |
Contracting Method | Bids by Invitation |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $49,000,000 [brand] Estimate |
Plans Available from | General Contractor |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Selective Demolition, Concrete, Shotcrete, Reinforcing SCOPE OF WORK Bid Package #10 SCVMC Old Main Hospital Building Demolition and Rebuild Phase 1, 2, 3 (partial), 4 (partial), 5, Utilities, Sitework SUMMARY OF THE WORK This Bid Package covers all work shown in the Bid Documents, with the exception of the following: . Soft demolition within the footprint of the Old Main Building structure (East & West) as shown in Phase 3 of the contract documents . Hazardous material abatement within the footprint of the Old Main Building Structure (East & West) as shown in Phase 3 of the contract documents . Structural Demolition of the Old Main Hospital Building (East & West) including all seven floors and the basement as shown in Phase 3 and Phase 4 of the contract documents . Infill of the Old Main (East) basement footprint to rough grade as shown in Phase 5 of the contract documents . Construction of the new 4-story (+ basement & roof) Hospital building at the (West) side as shown in Phase 4 of the contract documents The following are the Sub-Packages to Bid Package #10. Each sub-package details the corresponding specification section the Bidder is responsible for in its entirety, as well as the specific scope of work that follows. Note that the scope detailed below each Sub-Package may not include all items (Refer to Design Documents and Specs). Also, reference to drawing sheets and details are meant for general guidance for the bidders; there may be additional details and drawing sheets which are not identified in the scope sections below. 1. BID PACKAGE #10 Sub Package: 2. Package 10a Selective Demolition, Concrete, Shotcrete, Reinforcing 3. Package 10b Metal Stairs, Metal Fabrications 4. Package 10c Rough Carpentry, Misc. Rough Carpentry 5. Package 10d Roofing and Waterproofing, Sheetmetal Flashing, Expansion Joints 6. Package 10e Framing & Drywall, Insulation, Doors/Frames/Hardware, Plaster 7. Package 10f Ceilings 8. Package 10g Glass & Glazing, Wall and Soffit Paneling 9. Package 10h Flooring 10. Package 10i Painting, High Performance Coatings 11. Package 10j Specialties 12. Package 10k Fire Suppression 13. Package 10l Plumbing 14. Package 10m Heating, Ventilation, & Air Conditioning 15. Package 10n Electrical, Fire Alarm 16. Package 10o Earthwork, Exterior Improvements 17. Package 10p Utilities Budget: 49,000,000.00 BID PROCESS SCHEDULE Bid Documents Distributed - 08/10/22 Mandatory Bid Walk - 08/18/22 Last Day to Submit Request for Information - 08/23/22 Addendum Issued - 08/30/22 Bid Proposals Due - 09/08/22 by 2:00pm Public Bid Openings via Video Conference - 09/08/22 at 3:00PM Bid Review Process - 09/09/22 to 09/13/22 Award Contracts - Within 45 Days of Bid Date Contract Fully Executed - Within 60 Days of Bid Date Email Stronghold Engineering at craigs@teamsei.com for a link to all project Bid Documents or if you have any project question. NOTE: The work is subject to Prevailing Wages and a Project Labor Agreement (PLA). The work included in the three construction packages is under the jurisdiction of the Office of Statewide Health Planning and Development (OSHPD) and each package will require separate OSHPD permits. Project Contact: STRONGHOLD ENGINEERING, INC. 150 W. Walnut Avenue, Perris, CA 92571 Phone: (951) 684-9303 Fax: (951) 684-3813 Contact: Craig Shaver, email: craigs@teamsei.com Cell# 408-768-9505 PUBLIC WORKS The project is subject to compliance monitoring and enforcement by the Department of Industrial Relations and Federal Acquisition Regulation. At the time of submitting a bid, the subcontractor shall possess a valid license issued by the California Contractors State License Board. In addition, the bidder shall be registered with the DIR as a public works contractor. PREVAILING WAGE Subcontractor and its agents, employees, and tiered subcontractors shall comply with provisions of the California Labor Code, including those relating to payment of prevailing rates of wages. Subcontractor and its tiered subcontractors must be registered with the Department of Industrial Relations and qualified to perform public work pursuant to Labor Code Section 1725.5. Stronghold will not accept any bid without proof of current registration to perform public work pursuant to Section 1725.5. BONDING All subcontractors will have to furnish performance and payment bonds. See RFP Bid Docs. SMALL BUSINESS Stronghold Engineering, Inc. is strongly encouraging ALL Small Business Subcontractors and Suppliers to bid on this project including (SBE) - (SDB) - (WBE) - (MBE) - (DBE) - (UDBE) - (WOSB) - (VOSB) - (DVBE) - (SDVOSB) - (HUBZone) and any others not listed. Performance and Payment Bonds may be required for this project. Stronghold Engineering, Inc. is an Equal Opportunity Employer. Thank you for your help and we look forward to working with your company. PREQUALIFICATION Stronghold requests that Subcontractors participate in a prequalification program. Although prequalification is not required to bid, it shall be the responsibility of each subcontractor submitting bids to the prime contractor to complete the prequalification process as a condition of the contract. Failure to demonstrate sufficient qualifications to perform the work, in the sole discretion of Stronghold, may result in the forfeiture of the Contract. *Addendum 01 and 02 have been released. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | ,, 182,430 SF - 7 Stories Above Grade, 157,730 SF. 3 Stories Above Grade, 24,700 SF.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |