Similar Projects
Wealthy Street - Ethel Avenue to East City Limit - City of Grand Rapids
Infrastructure
Conception
$936,320 est. value
Grand Rapids, MI 49525

Fuller Avenue - Knapp Street to 3 Mile Road - City of Grand Rapids
Infrastructure
Conception
$316,763 est. value
Grand Rapids, MI 49525

Prestige Home Group - Parking Lot
Addition
Design
Byron Center, MI 49315

Smoke Shack BBQ
Renovation - 888 SF
Design
Walker, MI 49534

Meadowlane Drive Reconstruction
Alteration
Bidding
$1,600,000 est. value
Kentwood, MI

Paving & Site Lighting
Post-Bid

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2.17 MI of Hot Mix Asphalt Reconstruction and Bridge Rehabilitation
Results
MI

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

Ottawa Avenue _ Hastings Street to Newberry Street - City of Grand Rapids
Infrastructure
Conception
$400,000 est. value
Grand Rapids, MI 49503

Site Improvements and Extension of Existing Utilities
Infrastructure
Post-Bid
Ada, MI 49301

Grand Rapids Township Local Roads Program
Results
Less than $500,670 est. value
Grand Rapids, MI

PNC Bank Branch No. B839
Renovation
Construction
Wyoming, MI 49509

Last Updated 07/25/2022 02:04 PM
Project Title

M-40 - 128th Avenue to 134th Avenue - MDOT Allegan County

Physical Address View project details and contacts
City, State (County) Grand Rapids, MI 49503   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

2.69 miles of micro cold milling, single chip seal and fog seal. Temporary pavement markings to be placed after micro cold milling and permanent pavement markings placed after fog seal is applied. All work shall conform to the 2020 MDOT Standard Specifications for Construction. Length of Project: 2.69 Miles Type of Construction: Micro Cold Milling, Single Chip Seal and Fog Seal. The Board reserves the right to reject any and all bids or to waive irregularities therein, and to accept any bids which, in the opinion of the Board, may be most advantageous and to the best interest of the County. This contract will be considered for award on August 23, 2022.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents