Similar Projects
Z--Lagoon Valve Replacement
Term Contract
Results
NV 89046

Central Plant Upgrades
Renovation
Results
$2,286,650 to $2,407,000 est. value
Las Vegas, NV 89101

CMAR 19005 FWRC Preliminary and Primary Treatment Improvements
Renovation
Bidding
$150,000,000 est. value
Las Vegas, NV

On Call Construction
Term Contract
Results
$1,500,000 est. value
Henderson, NV

WRF Flow Equalization Basin
New Construction
Bidding
$7,500,000 to $8,400,000 est. value
Las Vegas, NV 89115

North Las Vegas Culinary Refrigeration Building C Replacement
Renovation
Results
$270,000 est. value
North Las Vegas, NV

Water Reclamation Facility - Biotower Removal
Renovation
Results
Elko, NV

Last Updated 04/08/2022 05:04 PM
Project Title

WRF - Water Reclamation Facility West Primary Clarifier Recoating and Repairs 2022

Physical Address View project details and contacts
City, State (County) Elko, NV 89801   (Elko County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The WRF West Primary Clarifier shall receive four coats of protective paint for all normally submerged metal surfaces above and below the high water overflow weirs including; the clarifier sludge bottom scraper blades; the scraper blades’ support structure; the center feed tube to the mechanical drive unit; the clarifier metal center well structure and center well supports; the clarifier scum arm assembly; the scum arm steel supports; the scum collection box; the exposed scum box piping; exposed sump pipe fittings; and all exposed steel pipe supports located within the West Primary Clarifier structure. The West Primary Clarifier walkway and walkway support structure located above/over the West Primary Clarifier overflow weir high water level shall receive three coats of protective paint for all metal surfaces to be coated. Work shall be completed in the field at the City of Elko Water Reclamation Facility (WRF) during normal working hours unless prior arrangements have been made with the WRF Superintendent. The West Primary Clarifier is 70 feet in diameter with 12-foot deep side walls (14-feet at the center well), as shown in the clarifier layout diagrams.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents