Similar Projects
Reconstruct Runway Safety Area Runway 34 EMAS Phase II - Broome County
Infrastructure
Conception
$3,000,000 CJ est. value
Johnson City, NY 13790

Reconstruct Runway Safety Area Runway 34 EMAS Phase II - Broome County
Infrastructure
Conception
$3,000,000 CJ est. value
Johnson City, NY 13790

I-88 Invert Paving, Towns of Colesville and Bainbridge, Broome and Chenango Counties
Infrastructure
Design
$2,600,000 CJ est. value
Colesville, NY 13787

Erie Avenue Storage Building
New Construction, Infrastructure - 14,850 SF
Design
$1,600,000 CJ est. value
North Tonawanda, NY 14120

Stratmill Road Water Tank Rehabilitation
Infrastructure
Bidding
$523,300 CJ est. value
Kirkwood, NY 13904

Softball Field Improvements - Phase 2
Infrastructure
Bidding
$600,000 CJ est. value
Binghamton, NY 13902

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Griswold Street - Water System Improvements
Infrastructure
Results
$794,215 CJ est. value
Middleport, NY 14105

Highway
Infrastructure
Results

Shawnee Road Self-Storage Facility
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
North Tonawanda, NY 14120

Amazon Distribution Center - Project FiFi / Niagara Falls
New Construction, Infrastructure - 3,000,000 SF
Pending Verification
$550,000,000 CJ est. value
Niagara Falls, NY 14304

Broome County Community College - Roadway / Parking Lot Modification - Broome County
Infrastructure
Conception
$600,000 CJ est. value
Binghamton, NY 13905

The Retreat at Bunn Hill
New Construction, Infrastructure
Design
$62,000,000 CJ est. value
Vestal, NY 13850

Glendale Park Walking Path
Infrastructure
Bidding
$250,000 CJ est. value
Endicott, NY 13760

Last Updated 03/23/2023 11:41 PM
Project Title

13.6 Miles of Asphalt Resurfacing & Replacement of Damaged Guiderail & Signs on I-81 in the Towns of Barker, Lisle & Triangle

Physical Address View project details and contacts
City, State (County) Lisle, NY 13797   (Broome County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected April 2022
Bids Due View project details and contacts
Estimated Value $19,748,551 [brand] Estimate
Plans Available from Agency's Affiliate - 01/05/22
Owner View project details and contacts
Architect View project details and contacts
Description

D264702, PIN 950124, FA Proj , Broome Co., Pavement Resurfacing With Guide Rail and Sign Replacement, I-81 from Exit 7 to Cortland County line, Towns of Baker, Lisle and Triangle., Bid Deposit: 5% of Bid (~ $1,500,000.00) This project mills and resurfaces Interstate 81 from exit 7 at Castle Creek to the Cortland County Line, in the towns of Barker, Triangle, and Lisle, Broome County. This Project Is Located in the Southern Tier Region and Includes the Following: Counties Broome Villages Whitney Point Every bid must be accompanied by a bid bond, certified check or bank cashier's check payable to the NYS Department of Transportation, in the sum of the amount shown on the proposal title page. Bonds must be on form CONR 391. Electronic bids must include an electronic bid bond. Contract administration or procurement questions may be submitted either electronically or directed to Robert Kitchen, or the Assistant Director/Director of the Office of Contract Management, (518) 457-2124. Federally Aided Contracts identify a DBE Goal, and 100% NY State Funded Contracts identify both MBE and WBE Goals. Contracts with 0% Goals are generally single operation contracts, where sub-contracting is not expected, and smaller size contracts -- both of which may present direct bidding opportunities for Small Business Firms, including, but not limited to, DBE or MBE and WBE. The New York State Department of Transportation, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation and Title 23 Code of Federal Regulations, Part 200, Title VI Program and Related Statutes, as amended, issued pursuant to such Act, hereby notifies all who respond to a written Department solicitation, request for proposal or invitation for bid that it will affirmatively insure that in any contact entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, disability/handicap and income status in consideration for an award. NYDOT - Pavement Resurfacing With Guide Rail and Sign Replacement MBE : 1.1% WBE : 6.9% DBE : 8% Construction Complete September 2022 Consultation Code: 05E1NY00-2021-SLI-2544 Event Code: 05E1NY00-2021-E-08007 The project proposes to mill and resurface the asphalt pavement and shoulders with warm-mix asphalt (WMA) in Towns of Barker, Lisle, and Triangle in Broome County. Four ramps at Exit 8 are also included within resurfacing limits. Work also include replacing damaged or non-compliant sections of guide-railing, replacing damaged signs, and re-establishing MIARDs and epoxy markings. Letting is due in February 2022.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents