Last Updated 01/12/2022 04:16 AM
Project Title

On-Call Patching, Paving and Milling

Physical Address View project details and contacts
City, State (County) (Cleveland, Gaston Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1 SP Emergency Callback Mobilization 2 EA 2 250 Removal of Existing Asphalt Pavement 100 SY 3 545 Incidental Stone Base 150 TON 4 SP Patching Existing Pavement Case 1 (0 to 100 Tons) 300 TON 5 SP Patching Existing Pavement Case 2 (Over 100 Tons) 650 TON 6 SP Incidental Milling Case 1 (0 to 500 SY) 250 SY 7 SP Incidental Milling Case 2 (Over 500 SY) 750 SY 8 SP Asphalt Concrete Surface Course Type S9.5C – Case 1 (0 to 100 Tons) 200 TON 9 SP Asphalt Concrete Surface Course Type S9.5C – Case 2 (Over 100 Tons) 200 TON 10 SP Asphalt Concrete Intermediate Course Type I19.0C – Case 1 (0 to 100 Tons) 50 TON 11 SP Asphalt Concrete Intermediate Course Type I19.0C – Case 2 (Over 100 Tons) 115 TON 12 SP Asphalt Concrete Base Course Type B25.0C – Case 1 (0 to 100 Tons) 100 TON 13 SP Asphalt Concrete Base Course Type B25.0C – Case 2 (Over 100 Tons) 150 TON 14 SP ACSC S9.5C (Leveling Course) Case 1 (0 to 100 Tons) 300 TON 15 SP ACSC S9.5C (Leveling Course) Case 2 (Over 100 Tons) 200 TON 16 620 Asphalt Binder for Plant Mix 86 TON 17 858 Adjustment of Manholes 4 EA 18 858 Adjustment of Meter Boxes or Water Valves 4 EA 19 858 Adjustment of Drop Inlets 4 EA 20 858 Adjustment of Catch Basin 4 EA 21 SP Extruded Asphalt Concrete Curb 1000 LF 22 1205 Paint Pavement Marking Lines (4”) 950 LF 23 1205 Paint Pavement Marking Lines (6”) 550 LF 24 SP Daytime Temporary Lane Closure (2-Lane, 2-Way Roadway) 10 EA 25 SP Daytime Temporary Lane Closure (Multi-Lane / Divided Roadway) 10 EA 26 SP Daytime Lane Closure Shift (Multi-Lane / Divided Roadway) 10 EA 27 SP Nighttime Temporary Lane Closure (2-Lane, 2-Way Roadway) 5 EA 28 SP Nighttime Temporary Lane Closure (Multi-Lane / Divided Roadway) 5 EA 29 SP Nighttime Lane Closure Shift (Multi-Lane / Divided Roadway) 5 EA

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.