Similar Projects
Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Central Region AE IDIQ
New Construction, Term Contract
Design
$25,000,000 est. value

Design - Community Park Shelter
New Construction, Alteration
Bidding
$275,000 est. value
Vadnais Heights, MN 55127

Design - Community Park Shelter
New Construction, Alteration
Bidding
$275,000 est. value
Vadnais Heights, MN 55127

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

2020 Architect and Engineering IDIQ
Post-Bid
$5,000 to $75,000,000 est. value

Facilities Planning and Industrial Engineering A/E Contract
Results

Facilities Planning and Industrial Engineering A/E Contract
Results

Material Testing and Subsurface Exploration
Infrastructure
Bidding
Saint Paul, MN

A-E Architectural Design Services at Various Installations
Post-Bid
Less than $99,000,000 est. value

Mississippi River Headwaters Watershed Bank Service Area
Results

Engineering, Planning and Development
Post-Bid

Indefinite Delivery Indefinite Quantity Architectural-Engineering Contracts
Results

Architect-Engineering (AE) Indefinite Delivery Contract (IDC) in Support of the Defense Health Agency (DHA) and Component Medical Commands
Post-Bid
Less than $45,000,000 est. value
Washington, DC

River Balcony Project
Results
Saint Paul, MN 55102

Last Updated 05/06/2022 02:21 PM
Project Title

Design Services - Classroom A/V Technology Upgrades at Murray Middle School and Harding Senior High School

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55108   (Ramsey County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,828,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The A/V Technology upgrade includes documentation and evaluation of existing conditions and recommendations for technology layout in each room, evaluation of new data and fiber needs in the buildings, and proper coordination for timely installation of fully functional systems. The work is limited in scope and includes the following: Electrical engineering and design as required to provide power and surface raceway in approximately 150 classrooms to support new projection systems provided by others. Projection locations to be on front walls of classroom spaces and above existing or new white boards provided by others. Provide electrical drawings identifying electrical panels to support the work. Drawings to include minor architectural work as required to support the work. Work to be divided as follows: Murray Middle School – approximately 45 classrooms Harding High School – approximately 101 classrooms Conference rooms as needed

Details

Architectural, Addition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents