Similar Projects
Recycling Center Modernization - Town of West Hartford
Renovation
Conception
$1,750,000 CJ est. value
West Hartford, CT 06110

Architectural/Engineering Services for the Department Public Works (DPW) Selective Renovations Design
Renovation
Conception
Windsor, CT 06095

King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

Cheshire Community Ymca
Alteration
Design
Southington, CT 06489

Eisenhower Park Pool and Pool House Reconstruction
New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
West Hartford, CT 06117

Farmington High School and FPS Central Office Projects
Term Contract, Demolition, New Construction, Renovation, Infrastructure - 239,500 SF
Bidding
$135,532,699 CJ est. value
Farmington, CT 06032

Renovation Project - Easton Place Apartments
Infrastructure, Renovation
Sub-Bidding
$1,923,660 CJ est. value
East Hartford, CT 06118

Renovation Project - Dillon Place Apartments
Infrastructure, Renovation
Sub-Bidding
$24,518,000 CJ est. value
Hartford, CT 06106

Site Upgrades at Elms Village, The Highlands, Rochambeau Apartments
Post-Bid
Hartford, CT 06108

Downtown Traffic Signal Improvements - Phase I
Infrastructure
Post-Bid
$4,000,000 CJ est. value
Hartford, CT 06103

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Renovations at Bristol City Hall
Renovation
Construction
Bristol, CT 06010

Enfield Street School and Henry Barnard School Parking Lot Improvements
Infrastructure
Construction
$570,180 CJ est. value
Enfield, CT 06082

Loukopoulos Building E
New Construction, Infrastructure - 12,600 SF
Pending Verification
$2,500,000 CJ est. value
Southington, CT 06489

Last Updated 09/23/2022 03:32 AM
Project Title

Public Works Fueling Facility - Town of West Hartford

Physical Address View project details and contacts
City, State (County) West Hartford, CT 06107   (Hartford County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The installation of a fuel facility will benefit the Town by saving on the retail and operational costs associated with the day to day operations of the Public Works fleet and by providing an emergency fuel source during natural disasters or catastrophic events. Public Works has 149 pieces of equipment ranging from heavy-duty diesel plow trucks to small gas power equipment that would utilize the facility on a daily basis. The fuel fill station could also serve our fire apparatus, police vehicles, and town pool cars. The funding for this project will be used to install dual 10,000 gallon concrete above ground fuel storage tanks with secondary containment and vehicle impact and projectile resistance at the Public Works facility. The tanks would have self-mounted fuel dispensers and have an autonomous fuel control and accounting system with a canopy. As September 23, 2022, this project is currently in the FY 2023-2034 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2023-2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023-2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents