Similar Projects
PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

SR 134 - Culvert Replacement
Infrastructure
Bidding
$641,000 CJ est. value
Lynchburg, OH 45142

RFQ Design - New Industrial Trades Center - Belmont Technical Center
New Construction, Infrastructure
Post-Bid
$942,282 CJ est. value
Saint Clairsville, OH 43950

Old Winding Hill Road
Infrastructure
Post-Bid
$400,000 est. value
Bellaire, OH 43906

Four Lane Resurfacing - SR 7-05.88
Infrastructure
Results
OH

2021 Street Paving
Infrastructure
Results
Saint Clairsville, OH

Bikeways
Infrastructure
Design
$1,950,000 CJ est. value
Barnesville, OH 43713

Belmont County TR-219 MP 0.32 Slide Repair
Infrastructure
Post-Bid
$200,000 CJ est. value
Colerain Township, OH 43950

Chip Seal-BEL-SR 147-00.00
Infrastructure
Results
OH

New K-12 Building - Shadyside Local School District
New Construction, Infrastructure
Design
$47,000,000 CJ est. value
Shadyside, OH 43947

Overlay Bridge Deck W/modified Pcc - Elbys Br O/l
Infrastructure
Post-Bid
$600,000 CJ est. value
Triadelphia, WV 26059

Four Lane Resurfacing-BEL-SR 7-17.70
Infrastructure
Results
OH

SR 7 - Geologic Maintenance / Slide Repair
Infrastructure
Design
$2,000,000 CJ est. value
Bellaire, OH 43906

2022 Subdivision Resurfacing Project
Infrastructure
Post-Bid
$799,974 CJ est. value
Martins Ferry, OH 43935

Last Updated 02/11/2023 03:31 AM
Project Title

SR 7 - Bridge Preservation

Physical Address View project details and contacts
City, State (County) Bellaire, OH 43906   (Belmont County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected April 2025
Bids Due View project details and contacts
Estimated Value $20,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replace existing bridge with multiple shorter span bridges. The replacement bridges will be based on AER developed under PID 105324. As of February 11, 2023, the project is in Design status. Anticipated letting date is October 01, 2024. OHDOT - SR 7 - Bridge Preservation *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents