Similar Projects
Hydroelectric Controls Upgrade Project
Renovation
Bidding
$1,099,000 CJ est. value
Walla Walla, WA 99362

Deer Park Municipal Airport Sanitary Sewer Extension
Infrastructure
Bidding
$200,000 CJ est. value
Deer Park, WA 99006

Courthouse Replumbing of Potable Water
Renovation
Sub-Bidding
$40,000 CJ est. value
Stevenson, WA 98648

FX Hydronic Pipe and Valve Replacements
Renovation
Sub-Bidding
$623,500 CJ est. value
Bellingham, WA 98225

Ductile Iron Pipe
Alteration
Post-Bid
Everett, WA

Residential Plumbing South
Term Contract
Post-Bid
$4,000 est. value
WA

Mechanical and Plumbing On Call Portwide
Alteration
Results
$300,000 est. value
Seattle, WA

URGENT Residential Plumbing Repair
Alteration
Results
Spanaway, WA

Wastewater Lift Station 8 Upgrade
Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Woodland, WA 98674

CRC Mechanical Room Leak Mitigation
Renovation
Sub-Bidding
$40,000 CJ est. value
Olympia, WA 98505

Residential Plumbing North
Term Contract
Post-Bid
$7,500 est. value
WA

MHR - Urgent Residential Plumbing Repairs
Alteration
Results
$2,950 est. value
WA

Oroville Elementary Restroom Remodel
Build-out
Sub-Bidding
$290,000 CJ est. value
Oroville, WA 98844

Structural Leak Joint Sealant and Grouting Repairs Work Order
Alteration
Post-Bid
WA

Weatherization Residential Insulation 8550
Alteration
Results
Eatonville, WA

Last Updated 03/11/2023 03:01 AM
Project Title

Blueberry Lane Infiltration/Conveyance Project

Physical Address View project details and contacts
City, State (County) Monroe, WA 98272   (Snohomish County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,146,888 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Contract provides for the replacement of existing infiltration facilities at two locations, installation of pretreatment and water quality filtration structures, installation of stormwater conveyance pipes and catch basins needed to route flows to new pretreatment, water quality, and infiltration facilities, and other work. Of the two infiltration facilities planned for replacement, Infiltration Pipe #1, is located along Blueberry Lane approximately 650 feet west of the intersection with N. Kelsey Street, and the Children's Park Infiltration Facility is located at the Blueberry Children's Park. The project area potentially contains archaeological or historical objects that may have significance from a historical or scientific standpoint. The project area potentially contains archaeological or historical objects that may have significance from a historical or scientific standpoint. The Contractor shall conduct its operations in a manner that will accommodate such activities, including the reserving of portions of the work area for site testing, exploratory operations and recovery and removal of such objects as directed by the Engineer. All excavation work shall be bid under the assumptions that the top 3 feet of soil shall be excavated in 4-inch to 6-inch lifts. This cost shall be included in the unit price for each item requiring excavation into native soils. Est. Completion Date: Dec. 8, 2023 All Bid Proposals must be submitted on the forms furnished in the Contract Provisions, and each must be accompanied by a certified check, cashier's check, or bid bond (with authorized surety company as surety) made payable to the City of Monroe in an amount not less than five percent (5%) of the total bid including sales tax, and all listed additives and alternates, if any. Cash will not be accepted.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents