Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Groundhog Vista Landowners Roadwork
Bidding
Tucson, AZ 85743

Child Parent Centers Parking Lot
Renovation
Post-Bid
Tucson, AZ 85713

Gladden Farms Mike Etter Boulevard (North)
Post-Bid
Marana, AZ 85635

Road Maintenance - Santa Catalina Ranger District
Results
$500,000 to $1,000,000 est. value
Tucson, AZ

Pavement Management System Update
Results
Tucson, AZ 85756

Rocking K South Infrastructure
New Construction - 14,500 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Tucson, AZ 85747

Valencia East Extension
New Construction
Construction
$16,000,000 est. value
Tucson, AZ 85747

Los Portales Del Alamo Roadway Paving Project
Post-Bid
San Luis, AZ 85349

Dema Asphalt Crack Repair and Seal (M19-0073) Single
Results
Marana, AZ 85008

Costco #407 Entry Drive Widening
Renovation
Construction
Tucson, AZ 85712

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Sarasota Boulevard at Kinney Road Improvements
Results
$3,500,000 to $4,000,000 est. value
Tucson, AZ 85701

On-Call Asphalt Patching Services
Term Contract
Post-Bid
Sahuarita, AZ

Saguaro Bloom "7A" (Garnet Range Loop) Roadway Improvements
Results
Less than $1,500,000 est. value
Marana, AZ

Last Updated 12/16/2019 07:43 PM
Project Title

Construction Manager at Risk for Scenic Drive and Pima Farms Road Improvements

Physical Address View project details and contacts
City, State (County) Tucson, AZ   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Seeking a qualified Construction Manager at Risk (CMAR) to provide minor pre-construction and full construction services during the design and construction phases of this project. The WLB Group, Inc. has prepared the design plan and specifications for the proposed roadway improvements. Design phase activities are anticipated to be one hundred percent complete at the time of selection. Scenic Drive is a 2-lane rural collector roadway with 10’ travel lanes and 2’ shoulders. The contractor will be responsible for the drainage, roadway surface improvements, and 4’ meandering trail. All underground improvements have been completed, but final adjustments to water and sewer improvements will be included within the scope of work. Access along Scenic Drive will need to be maintained for residents living along this roadway alignment during the course of construction. Pima Farms is a minor collector with full ½ street improvements consisting of a 12’ travel lane, 5’ bike lane, curb & gutter, and 5’ detached sidewalk. The other ½ of the street will be partially improved with a 12’ travel lane and 6’ shoulder. The existing pavement on Pima Farms will be removed and replaced with these improvements. There are no underground improvements in Pima Farms Road. The contractor must keep 1-lane of Pima Farms open to traffic during the construction.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents