Similar Projects
Clinton Crossings Sewer and Water Extension
Infrastructure
Bidding
$400,000 est. value
Clinton, WI

2022 Street Improvements
Infrastructure
Bidding
$200,000 est. value
Milton, WI

Asphalt Mill and Overlay
Post-Bid
Edgerton, WI

2021 Paving South Creek Road from Shopiere Road to East West Hart Road
Infrastructure
Post-Bid
Beloit, WI 53511

Utility Structure Rehabilitation and Replacement
Results
$1,550,000 est. value
Janesville, WI

Philhower Road Reconditioning USH 51 to CTH G and Bartells Drive Extension Paving
Results
Beloit, WI

Depot Street Improvements
Infrastructure
Bidding
$440,000 est. value
Footville, WI 53537

Asphalt Milling/Pulverizing
Infrastructure
Post-Bid
WI

East Ridge Road Sanitary Extension
Results
Beloit, WI 53511

2022 Paving Program
Infrastructure
Bidding
$200,000 est. value
Beloit, WI

Twin Valley Road Improvements
Infrastructure
Post-Bid

C. Janesville, E. Racine Street, S. Randall Avenue Intersection
Results
WI

2022 Street & Utility Improvements
Infrastructure
Post-Bid
Evansville, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2022 Sanitary Sewer Televising
Infrastructure
Post-Bid
Milton, WI

Last Updated 04/15/2022 06:16 AM
Project Title

West Fulton Street and Utility Improvements

Physical Address View project details and contacts
City, State (County) Edgerton, WI 53534   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Henry Street between W. Fulton Street and W. Rollin Street, in the City of Edgerton, WI, will be reconstructed. Work items will include pulverizing HMA, replace sanitary sewer, watermain and some storm sewer, new base aggregates and HMA pavement, spot curb and gutter replacement, spot sidewalk replacement, and landscaping. Canal Street will have sanitary sewer replacement and asphalt replacement only.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks, Paving Specialties, Pavement Markings, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents