Similar Projects
Well House & Iron Treatment Plant
New Construction
Conception
Rochelle, IL 61068

Locomotive Repair Services at the Stickney Water Reclamation Plant
Renovation
Bidding
$315,000 est. value
Cicero, IL 60804

Installation of a New Air Diffuser System in the North Aeration Basin and Associated Work at the Egan Water Reclamtion Plant (EWRP)
Renovation
Bidding
$3,024,000 est. value
Elk Grove Village, IL 60007

Biosolids Handling System Upgrades
Renovation
Post-Bid
Collinsville, IL 62234

Water Treatment Plant Capital Improvements- East Reservoir Renovations And Repairs
Renovation
Post-Bid
Waukegan, IL

Water Reclamation Center Dewatering System Improvements
Results
$2,000,000 est. value
Carol Stream, IL 60188

Southern Illinois University - Edwardsville, Madison County Improve Water Treatment Plant Sand Filter
Results
Less than $900,000 est. value
Edwardsville, IL 62026

Professional Consulting Services - Renovation/Replacement SW Wastewater Treatment Plant Pump Station
Renovation, Infrastructure
Post-Bid
Rock Island, IL 61201

Waste Water Treatment Plant
Renovation, Addition
Results
Less than $12,750,000 est. value
Freeburg, IL 62243

Water Treatment Plant
New Construction
Post-Bid
Dawson, IL

Water Treatment Plant Filter Rehabilitation
Renovation
Results
Metropolis, IL

Ground Water Treatment Plant
New Construction
Post-Bid

Water System Improvements
Renovation
Results
Le Roy, IL

Water Treatment Plant - Phase I
New Construction
Post-Bid
$8,000,000 est. value
Mount Carmel, IL

Odor Control Systems
Renovation
Results
$14,598,000 to $17,671,000 est. value
Thornton, IL

Last Updated 05/31/2022 09:43 AM
Project Title

Water Treatment Plant Improvements - Phase 1

Physical Address View project details and contacts
City, State (County) Chester, IL 62233   (Randolph County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,009,200
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades to the existing Chester WTP including installation of high density lime feed system, rehabilitation of 1.42 MG and 0.5 MG ground storage tanks, rehabilitation of recarb tank, replacement of head tank, replacement of plant roof, piping modifications, construction of covered walkway, PCC sidewalk removal and replacement, electrical work, site work and other miscellaneous items of work.

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents