Similar Projects
Juniper Ridge Public Works Administration, Lab, and Warehouse - FA25AX - City of Bend
New Construction, Infrastructure
Conception
$48,804,000 CJ est. value
Bend, OR 97703

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

Cottages on Helmholtz
New Construction, Infrastructure
Design
$32,800,000 CJ est. value
Redmond, OR 97756

Neff and Purcell Intersection Improvements
Infrastructure
Bidding
$4,500,000 CJ est. value
Bend, OR 97701

Neff and Purcell Intersection Improvements
Infrastructure
Bidding
$4,500,000 CJ est. value
Bend, OR 97701

Bend Seed Extractory Site Improvements
Renovation, Infrastructure
Sub-Bidding
$1,503,700 CJ est. value
Bend, OR 97701

Bend Seed Extractory Site Improvements
Renovation, Infrastructure
Sub-Bidding
$1,503,700 CJ est. value
Bend, OR 97701

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

Wilson Avenue Corridor Project - Construction Manager/General Contractor
Infrastructure, Alteration
Post-Bid
Bend, OR

US 20 Ward - Hamby Road Intersection
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Bend, OR 97701

US97 - Redmond - Bend Project the Dalles-California Hwy
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Redmond, OR

US97: Multi-Use Trail (Baker Rd. - Lava Butte)
Infrastructure
Design
$4,677,093 CJ est. value
Bend, OR 97707

Citywide Safety Improvements - 3rd & Pinebrook
Infrastructure
Bidding
$663,000 CJ est. value
Bend, OR 97703

Deschutes Public Library Redmond Library - Bid Package #003 - Part 2 of 2 - Bid Items #005 & #009
Demolition, LEED Certification, New Construction, Infrastructure - 38,018 SF
Sub-Bidding
$34,240,600 CJ est. value
Redmond, OR 97756

2022 Residential Type II Slurry Project
Infrastructure
Post-Bid
$440,000 est. value
Bend, OR

Last Updated 10/19/2022 03:05 AM
Project Title

Construction of Pump Station Decommissioning Project, Phase 4

Physical Address View project details and contacts
City, State (County) Bend, OR 97702   (Deschutes County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $5,380,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Pump Station Decommissioning Phase 4. The Project consists of gravity sewer improvements on Ferguson Road between King Solomon Lane and Ferguson Court, that will allow the City to decommission the Camden and Ridgewater No. 2 Pump Stations. The Work includes installation of 18" and 8" gravity sewer main, crossing of the Central Oregon Irrigation District Canal, new sewer services, manholes, pump station decommissioning, accessible ramps, abandon existing pressure sewer mains, pavement restoration, traffic control, and miscellaneous items necessary to complete the Work. The Engineer's estimate is between $4,210,000 and $5,380,000. The project is funded by the Clean Water State Revolving Fund, administered through Oregon Department of Environmental Quality. The project is subject to the provisions of ORS 279C.800 through 279C.870 and the Federal Davis-Bacon Act and the higher of the two prevailing wages will be required to be paid. Prequalification is a requirement. Bidders must be prequalified with City of Bend at the time the bids are opened. Prequalification process is administered by the Private Development Engineering Division. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The scope of work generally includes the following: Decommissioning of the Camden and Ridgewater No. 2 pump stations; Installation of approximately 3,340 lineal feet of 18-inch diameter gravity sewer main; Installation of approximately 475 lineal feet of 8-inch diameter gravity sewer main; Installation of new sewer services, manholes and related appurtenances. New sewer services will be provided to approximately 13 properties that are currently served by onsite septic systems. Several homes currently served by pressure sewer systems will be reconnected to the new gravity sewer system; A Central Oregon Irrigation Canal (COID) crossing and coordination with COID; Installation of accessible ramps; Abandonment of existing pressure sewer mains; Reconnection of existing pressure sewer mains; Traffic control on a collector roadway; Pavement restoration, including full-depth reconstruction and grind and inlay operations.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents