Similar Projects
Nature Trail Construction
Post-Bid
Claremont, NH 03743

Rehabilitation of Barn Door Gap Road Bridge over Big River (NHDOT Bridge No. 057/137)
Post-Bid
Strafford, NH

Roxbury Street Bridge Replacement
Results
Less than $1,400,000 est. value
Keene, NH

State Aid Highway Project NH Route 3A & Dunklee Road Intersection Improvement & State Aid Bridge Project Dunklee Road Bridge Rehabilitation Over Bow Bog Brook
Results
$1,800,000 to $2,100,000 est. value
Bow, NH

Lift Bridge PLC Services
Term Contract
Post-Bid
Concord, NH 03302

Bunker Hill Road Bridge Replacement over Mill Brook
Results
$500,000 to $550,000 est. value
Tamworth, NH

Electrical Inspection, Maintenance and Repair for Bridges
Post-Bid
Concord, NH 03302

Bridge Preservation on BR No 187/065, US 302/NH R4oute 10 over I-93 in Littleton
Results
Less than $1,320,325 est. value
Littleton, NH 03561

Expanding Polymer Injection
Post-Bid
Sanbornton, NH 03269

Bridge Preservation Work on BR No 139/040 that Carries US 4 over River Road and BR No 131/035 that Carries Tremont Str over the Contoocook River
Results
Less than $1,705,470 est. value
Boscawen, NH 03303

Repairs to Mill Road Bridge
Post-Bid
Brentwood, NH 03833

Bridge Preservation on Three Bridges in Plymouth and Campton
Results
Less than $1,844,705 est. value
Campton, Plymouth, NH 03264

Dougherty Lane Bridge Repair over the Middle Branch Piscataquog River
Post-Bid
New Boston, NH

Rehabilitation of Bridge No. 102/165, Hartshorn Mill Road over Hartshorn Brook
Results
Less than $107,020 est. value
Milford, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Last Updated 05/07/2021 09:42 AM
Project Title

Bridge preservation in Meredith US Route 3 over Maple Street and NHRR, Gilford NH Route 11 over the Gunstock River and Gilford 11A over Poor Fram Brook

Physical Address View project details and contacts
City, State (County) Georges Mills, Meredith, NH (Belknap, Sullivan Counties)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,714,832
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Consists Of The Preservation Of Meredith Br. No. 184/138 (Us Route 3 Over Maple Street And Nhrr), Gilford Br. No. 102/099 (Nh Route 11 Over The Gunstock River), And Gilford Br. No. 138/137 (Nh Route 11a Over Poor Farm Brook).

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents