Similar Projects
Install Emergency Cooling Tower Makeup Water
Design
$500,000 to $1,000,000 est. value
Cape Canaveral, FL 32925

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Raw Water Well #9
Results
Hallandale, FL 33009

Annual Agreement For Wastewater Pump Station Repair And Renovation
Term Contract
Post-Bid
FL

Wetwell, Tank and Pipe Cleaning and TV Inspection Services
Results
Jacksonville Beach, FL

SHIP Program Well and Septic Installation
Post-Bid
Macclenny, FL 32063

Saratoga Springs Plant Site Well Construction
Results
Green Cove Springs, FL

Irrigation Well Replacement
Term Contract
Post-Bid
Land O' Lakes, FL 34639

Tank Hill Water Facility Improvements
Results
$2,800,000 est. value
Dade City, FL 33525

Last Updated 11/29/2021 12:42 PM
Project Title

Design and Permitting of Class I Deep Injection Well at Prineville WTP

Physical Address View project details and contacts
City, State (County) Port Saint Lucie, FL   (Saint Lucie County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The deep injection well system currently consists of one Class I deep injection well (IW1) and an associated dual-zone monitor well (MW-1), a surge control system, yard piping and instrumentation. The permitted flow rate of IW-1 is up to 5.1 million gallons per day, which is equivalent to 3,510 gallons per minute for the RO plant at a capacity of 11.15 MGD. The Prineville Injection Well injection interval is set between 2,872 to 3,353 feet BPL

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents