Similar Projects
Last Updated | 11/29/2021 12:42 PM |
Project Title | Design and Permitting of Class I Deep Injection Well at Prineville WTP |
Physical Address | View project details and contacts |
City, State (County) | Port Saint Lucie, FL (Saint Lucie County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Pumps and Wells |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The deep injection well system currently consists of one Class I deep injection well (IW1) and an associated dual-zone monitor well (MW-1), a surge control system, yard piping and instrumentation. The permitted flow rate of IW-1 is up to 5.1 million gallons per day, which is equivalent to 3,510 gallons per minute for the RO plant at a capacity of 11.15 MGD. The Prineville Injection Well injection interval is set between 2,872 to 3,353 feet BPL |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |