Similar Projects
Bowman Sunfish Warehouse
New Construction, Infrastructure - 480,000 SF
Conception
$52,000,000 CJ est. value
Hagerstown, MD 21740

Burnside Bridge Road Culvert 01/03 - Washington County
Infrastructure
Conception
$264,000 est. value
Sharpsburg, MD 21782

AutoZone #6200 / Hagerstown
New Construction, Infrastructure
Design
$1,500,000 CJ est. value
Hagerstown, MD 21740

Boonsboro High Irrigation Well Connections
Infrastructure
Bidding
$40,000 CJ est. value
Boonsboro, MD 21713

CHOH 245002 and 287711 Rehabilitate Locks 1, 2, and 5 and Georgetown Walls
Infrastructure
Bidding
$10,000,000 CJ est. value
Hagerstown, MD 21740

Hagerstown Multi-Use Sports and Events Facility GMP #5
Demolition, Renovation, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Hagerstown, MD 21740

Z--CHOH 245002/287711 - Rehabilitate Canals 1, 2, and 5 and Georgetown Wall
Alteration
Post-Bid
$10,000,000 est. value
Hagerstown, MD

JLG Crayton History Trail
Infrastructure
Post-Bid
Hagerstown, MD 21742

Oak Ridge Drive Sight Distance Improvement
Infrastructure
Results
$50,000 to $100,001 est. value
Hagerstown, MD 21740

Leitersburg-Smithsburg Road Stream Restoration Along Little Grove Creek
Infrastructure
Results
$500,001 to $1,000,000 est. value
Smithsburg, MD 21783

Currwood Logistics Park
New Construction, Infrastructure - 1,521,600 SF
Construction
$164,000,000 CJ est. value
Hagerstown, MD 21740

Hitachi Rail Assembly Plant
New Construction, Infrastructure - 307,000 SF
Pending Verification
$70,000,000 CJ est. value
Hagerstown, MD 21740

Hoffman MPH Industrial
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Hagerstown, MD 21740

Country Store Lane Culvert 16/06 - BRG088 - Washington County
Infrastructure
Conception
$300,000 est. value
Hagerstown, MD 21740

Microsurfacing on Various Roadways in Washington County Surface Treatment
Infrastructure
Bidding
$5,000,000 CJ est. value
Hagerstown, MD 21740

Last Updated 04/03/2023 11:20 AM
Project Title

Raceway Valve Replacement - Albert Powell Fish Hatchery

Physical Address View project details and contacts
City, State (County) Hagerstown, MD 21740   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $42,032 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, etc., necessary to replace raceway cleanout valves at Albert Powell Trout Hatchery. The project is located at 20901 Fish Hatchery Road, Hagerstown, Washington County, Maryland. All Minority Business Enterprise are encouraged to respond to this solicitation. This is for SBR Vendors only. The following bonds are required if the Contract Amount, including Unit Prices, Allowances and Alternates as applicable, is in excess of $100,000.00 1) Bid Bond in the amount of 5% 2) Payment and Performance Bonds in the amount of 100% The work shall be completed within 120 calendar days from the start date of the contract. If the work is not completed within the time period specified, the contractor will be liable for liquidated damages of $250.00 per calendar day as specified in the General Conditions. QUESTIONS DEADLINE: The deadline for questions has been established as 3/16/23 at 2:00 pm, to assure that there is enough time to allow the A/E to provide responses and Addendum issuance if necessary. Please submit all questions to the Procurement Officer: James Alston james.alston1@maryland.gov and Supervisor Christine Stenhouse christine.stenhouse1@maryland.gov. The Project Cost Classification for this solicitation is: Small Procurement Category III, under $100,000 Minority Business Enterprises are encouraged to respond to this Solicitation Bid prices are irrevocable for a period of 120 days following bid opening. After opening bids, the Procurement Officer may request bidders to extend the time during which the State may accept their bids, provided that, with regard to bids, no other change is permitted.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents