Similar Projects
Holladay Boulevard Box Culvert Rehabilitation Project
Infrastructure
Bidding
$600,000 est. value
Salt Lake City, UT 84117

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

I-80; Culvert Rehabilitation
Results
$1,277,955 est. value

Complex MS4 Project
Term Contract
Results
Taylorsville, UT 84129

Stormwater Inlet Grate
Infrastructure
Post-Bid
Riverton, UT

900 East Pioneer Road to 12200 South Widening Project
Results
Draper, UT 84020

Roundabout 1300 East and Pioneer Road
Infrastructure
Post-Bid
Draper, UT 84020

Highland Drive and Vestry Road Intersection Project
Results
Draper, UT

2022 CIPP Rehabilitation Project
Infrastructure
Post-Bid
$500,000 est. value
Bluffdale, UT

Fishing Ponds Repairs
Results
South Jordan, UT 84095

5600 West Midas Creek Improvements Project
Infrastructure
Post-Bid
$247,000 est. value
Herriman, UT 84096

Midas Creek Trail Over Welby Jacob Canal
Results
Less than $500,000 est. value
UT

Holladay Boulevard Sidewalk Infill Project
Infrastructure
Post-Bid
$300,000 est. value
Salt Lake City, UT 84117

UDOT Region 2 Ms4 Project
Results
Salt Lake City, UT 84104

Last Updated 07/15/2022 07:07 AM
Project Title

Jordan Valley Water Treatment Plant Basins 3-6 Sedimentation Basins Upgrades

Physical Address View project details and contacts
City, State (County) Riverton, UT 84065   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $17,000,000 to $22,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes (1) demolition of existing "chain and flight" sedimentation equipment in JVWTP basins 3-6, (2) replacement of the demolished equipment with new chain and flight equipment pre-purchased by the Owner; (3) electrical equipment and electrical conductors for a completely functioning system; and, (4) procurement and installation of 140 MGD of high-rate inclined plate settler equipment in the same JVWTP basins 3-6. Due to uncertainty in global stainless-steel prices, the contractor will be allowed to index prices for the plate settler equipment as specified in the contract documents

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents