Similar Projects
Twin Valley Road Improvements
Infrastructure
Bidding

21st Avenue and 42nd Street Resurfacing
Post-Bid
Kenosha, WI

Repaving 308th Avenue
Post-Bid
$234,000 est. value
Kansasville, WI

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

75th Street, C. Kenosha / V. Pleasant Prairie, IH 94 to 74th Avenue; 75th Street, C. Kenosha / V. Pleasant Prairie, 74th Avenue to 43rd Avenue; 75th Street, C. Kenosha / V. Pleasant Prairie, Frontage
Results
Kenosha, Pleasant Prairie, WI 53140

2021 Village Seal Coating Program
Infrastructure
Post-Bid
Salem, WI

Highway Improvement Project CTH H from State Line to CTH ML (116th Street)
Results
$723,000 est. value
Bristol, WI 53104

2022 Paving Program Utility Adjustment and Curb Repair
Infrastructure
Post-Bid
WI

Sheridan Road, City of Kenosha, 91st Street To 85th Street
Results
WI

2022 Paving Program Phase 1
Term Contract, Infrastructure
Post-Bid
Pleasant Prairie, WI 53158

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Dump Station Reconfiguration/Relocation GPC
Renovation
Results
Kansasville, WI

Lake Geneva - Kenosha, CTH O - STH 75, 236th Avenue - 125th Avenue
Results
Kenosha, Lake Geneva, WI

2021 Paving Program Phase 1
Results
Pleasant Prairie, WI

2021 Paving Program - Phase II
Results
$480,000 est. value
Pleasant Prairie, WI

Last Updated 03/14/2022 02:32 AM
Project Title

North South Freeway, CTH ML - STH 50, East Frontage Road

Physical Address View project details and contacts
City, State (County) WI   (Kenosha County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Off-System; 0.000 Miles; Mill, Grade, Storm Sewer, Base, Concrete Pavement, Asphalt Pavement, Curb and Gutter, Sidewalk, Beam Guard, Signals, Signing, Pavement Marking, and Two Structures. Excavation Common, 895; Base Aggregate Dense, 3,403 Ton; Base Aggregate Open Graded, 246 Ton; Concrete Pavement, 6,043 SY; Bar Steel Reinforcement Coated, 516 Lbs; Marking Tape, 673 LF; Marking Epoxy, 76,891 LF; Conduit, 4,400 LF; Concrete Curb and Gutter, 3,503 LF; Concrete Sidewalk, 4,132 SF; Beam Guard, 2,261 LF; Beam Guard Energy Absorbing Terminals, 14 Each; Asphaltic Surface, 88 Ton; HMA Pavement, 22,750 Ton; Removing Asphaltic Surface Milling, 99,500 SY; Tack Coat, 14,190 Gals; Signs, 673 SF; Concrete Pavement Partial Depth Repair.1,548 LF; Riprap, 4 CY; Pull Boxes, 25 Each; Concrete Bases, 13 Each/ Poles, 8 Each.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents