Similar Projects
Y1LB--Widen Circle 1 Drive at Bldg 9 (VA-21-00047524)
Bidding
$100,000 to $250,000 est. value
Lyons, NJ 07939

Pavement Reconstruction at Hillsborough Elementary School
Bidding
NJ 08844

Road Improvements - Harlan School Road West
Post-Bid
Branchburg, NJ 08876

Improvements to Barber Boulevard and Von Steuben Lane
Post-Bid
South Bound Brook, NJ 08880

Ludlow Avenue Road Improvements
Results
Far Hills, NJ 07931

2019 Capital Road Improvement Program Base Bid - Various Roads
Results
$764,310 est. value
North Plainfield, NJ 07060

Maintenance Job Order Contracting (Joc) Infrastructure Repairs, Central - 2021
Bidding
$5,000,001 to $10,000,000 est. value

C1LB--Widen Circle 1 Drive at Bldg. 9 (VA-20-00029812)
Post-Bid
$100,000 to $250,000 est. value
Lyons, NJ 07939

2019 Road Improvements Project
Results
Belle Mead, NJ 08502

Repaving at Hillsborough Public Schools
Post-Bid
Hillsborough, NJ 08844

FY 2018 NJDOT Municipal Aid Program Clinton Avenue Improvements - Green Brook Road to the Green Brook Bridge
Results
$351,878 est. value
North Plainfield, NJ 07060

Improvements to Woodmere Street and Weiss Terrace
Post-Bid
Raritan, NJ 08869

South Cadillac Drive Improvements
Results
$389,800 est. value
Somerville, NJ 08807

Overlay and Milling of Various Township Roads
Post-Bid
Warren, NJ 07059

Blue Road Improvements (State Aid Project)
Results
Belle Mead, NJ 08502

Last Updated 05/06/2021 10:13 AM
Project Title

Steeplechase Lane Improvement Project

Physical Address View project details and contacts
City, State (County) NJ 08807   (Somerset County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide construction services which will consist of improvements to the entire lengths of Steeple Chase Lane, Perry Avenue and Eisenhower Avenue, including but not limited to milling and resurfacing the pavement with full-depth reconstruction in certain areas, storm sewer upgrades, new accessible ramps, sidewalk replacement, and areas of new curbs and driveway entrance repair. Overall project length is approximately 2,800 linear feet. All disturbed areas will be restored to their original condition.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents