Similar Projects
Slc Airport Economy Parking Lot Bus Route Reconfiguration
Bidding
Salt Lake City, UT

Magna 8950 W Sidewalk from 2800 S To 2700 S
Bidding
$160,000 to $260,000 est. value
Salt Lake City, UT

BRHS Natatorium Parking Lot Expansion
Sub-Bidding
Brigham City, Garland, Tremonton, UT 84312

New Parking Lot and Elevated Parking Deck Adjacent to City Hall
Post-Bid
Saint George, UT 84770

The Inn Between Cement Walkway
Post-Bid
Salt Lake City, UT 84105

Parking Lot Seal and Coat, Paint
Results
Logan, UT 84341

Holladay Safe Routes to School Safe Routes to Schools/Pedestrian/Bicycle Safety
Results
Less than $500,000 est. value
UT

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

Family History Library Main Level Restroom
Renovation - 27,263 SF
Construction
$300,000 est. value
Salt Lake City, UT 84150

Riverton Spa
New Construction - 6,479 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Riverton, UT 84065

DFCM Construction - Pre Qualified Paving Contractors - Utah State Board of Education Accessible Parking Upgrades
Bidding
$1 to $110,000 est. value
Salt Lake City, UT 84111

Discover Restroom Refresh
Renovation
Post-Bid
Salt Lake City, UT 84120

Mesa Drive Sidewalk
Results
$170,000 to $225,000 est. value
Salt Lake City, UT 84190

Moonshine Arch Trailhead Improvements Non-Urban
Bidding
$500,000 est. value
UT

Pre-Qualified Contractors for Construction Projects
Post-Bid
South Jordan, UT

Reported 03/19/2021 12:00 AM
Project Title

Construction Of The Washington City Elephant Arch Trailhead Project

Physical Address View project details and contacts
City, State (County) Washington, UT   (Washington County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Restroom/Bath House, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Washington City Elephant Arch Trailhead project will consist of constructing a parking lot for the existing trailhead. The improvements will include grading, chat path walkway, tortoise fencing, prefabricated vault restroom building, and other related improvements.

Details

Restroom/Bath House, Approximately 160 SF New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents