Similar Projects
O'Reilly Auto Parts Store (D29) / Dallas
New Construction, Infrastructure - 7,453 SF
Conception
$1,500,000 CJ est. value
Dallas, TX 75227

Shadow Creek Crossing Retail Development / Mesquite
New Construction, Infrastructure - 57,500 SF
Conception
$15,000,000 CJ est. value
Mesquite, TX 75181

Mockingbird Lane Office Development
New Construction, Infrastructure - 150,000 SF
Design
$32,000,000 CJ est. value
Dallas, TX 75235

Maple Avenue Apartments
New Construction, Infrastructure
Design
$3,600,000 CJ est. value
Dallas, TX 75235

Carbon Pump Station Improvements
New Construction, Infrastructure
Post-Bid
$35,000,000 CJ est. value
Irving, TX 75038

Replacement of Fire Station 41
New Construction, Infrastructure - 8,248 SF
Post-Bid
$4,208,000 CJ est. value
Dallas, TX 75230

Lake Highlands Trail Phase II - A and B and Lake Highlands Northern Extension - Site Development
Infrastructure
Results
$4,392,297 est. value
Dallas, TX

Floyd Branch RWWTP Dewatering Improvements
Renovation
Results
$100,000 to $130,000 est. value
Richardson, TX 75081

Irving Mall Site Work
Renovation - 767,000 SF
Construction
Irving, TX 75062

Elm Fork Water Treatment Plant Filter Complex - Phase I
New Construction, Infrastructure
Construction
$155,100,000 CJ est. value
Carrollton, TX 75006

Haven at Waterview / Richardson
New Construction, Infrastructure - 300,212 SF
Pending Verification
$90,000,000 CJ est. value
Richardson, TX 75081

McKinney Avenue Mixed-Use
New Construction, Infrastructure - 697,000 SF
Pending Verification
$200,000,000 CJ est. value
Dallas, TX 75201

City Jail Expansion and Upgrades - City of Carrollton
Addition, Demolition, Renovation, Infrastructure
Design
$2,400,000 CJ est. value
Carrollton, TX 75006

TRN Signal Construction - Group 10
Infrastructure
Post-Bid
$400,000 CJ est. value
Dallas, TX 75201

Demolition and Renovations to George Allen Courthouse 7th Floor Probate Court
Demolition, Renovation, Infrastructure
Results
$10,948,634 CJ est. value
Dallas, TX 75202

Last Updated 06/16/2023 02:38 PM
Project Title

Southside Wastewater Treatment Plant 2020 Major Maintenance and Rehabilitation

Physical Address View project details and contacts
City, State (County) Dallas, TX 75253   (Dallas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 05/19/2023 at 5:00 PM CT Major Maintenance and Rehabilitation project for the Southside Water Treatment Plant. Work of the Project includes, and not limited to, construction, rehabilitation, modifications, and/or replacement of equipment, piping, appurtenances, structural concrete work, excavation, electrical and instrumentation control systems, etc. throughout the Southside Wastewater Treatment Plant for the 2020 Major Maintenance and Rehabilitation Project. a. Improvements at Sulfur Dioxide (SO2) and Chlorine (Cl2) Buildings including, but not limited to: 1) Removal and disposal of existing SO2 fill lines 2) Removal and disposal of piping/appurtenances inside SO2 feeder and SO2 evaporator rooms 3) Removal of existing pipe protection structures (outside) 4) Structural concrete repairs 5) Installation of new SO2 fill lines, inclusive of trenching, backfilling, compaction 6) Installation of new SO2 piping/appurtenances loop inside SO2 feeder and SO2 evaporator rooms 7) Relocation of existing SO2 Mask Unit 8) Installation of new pipe protection structures (outside) 9) Installation of new ductbank and raceway 10) Asphalt pavements road repairs 11) Traffic control 12) Erosion protection 13) Grading 14) Miscellaneous clear/grub/seed b. Improvements at Screening and Thickening Facility including, but not limited to: 1) Multi-Rake Screens and Washer Compactor (a) Removal and disposal of existing basket screens, inclusive of all mechanical, electrical, instrumentation and controls (b) Removal and disposal of existing handrails, steel plates, fillets inside screen channels (c) Install new Multi-Rake Bar Screens and washer/compactors, inclusive of all mechanical, electrical, instrumentation and controls. Install miscellaneous NPW piping and appurtenances. (d) Existing dumpster modifications (e) Structural concrete improvements and repairs (f) Electrical, Instrumentation and Controls improvements. (g) Power Distribution System Study 2) Electrical Room 106 and MCC Rom 107 (a) Removal and disposal of existing HVAC system (b) Structural improvements and repairs 3) Electrical Room 100 (a) Install new positive pressurizing unit (PPU) (b) Miscellaneous piping (c) Structural improvements and repairs 4) Odor Control - Biofilters (a) Removal and disposal of existing organic biofilter media, HDPE floor plenum modules, existing irrigation system, humification system, and exiting ramp sidewalls (b) Structural concrete improvements and repairs (c) Install new biofilter media, new HDPE floor plenum modules, new irrigation system (heat traced and insulated), new humification system, and new existing HDPE liner (d) Traffic control 5) Gravity Belt Thickeners (GBT) (a) Rehabilitation of Gravity Belt Thickeners (GBT) No. 1, 3, 4, and 6 frame, bearings, rollers, and accessories. (b) Removal and re-installation of GBT enclosures (c) Miscellaneous piping and appurtenances repairs (d) Structural concrete repairs 6) Seal Water for Existing Thickening Sludge Pumps (a) Removal and disposal of existing NPW piping, fittings, and appurtenances (b) Removal and disposal of existing pressure reducing check valve (c) Install new NPW SCH 80 PVC piping, fittings, appurtenances, pipe supports, and instrumentation (d) Install new 10" pressure reducing check valve and valve support 7) Electrical Improvements (a) Demolish existing main substation switchgear (b) Demolish MCC-1 and MCC-2 located in Electrical Room 106 (c) Demolish Panel PP1 and PP2 located in Electrical Room 106 (d) Demolish MCC-3 located in Electrical Room 100 (e) Demolish Panel PP3 located in Electrical Room 100 (f) Install new main substation switchgear, including Vista switch, two substation transformers, and switchgear with outdoor housing. (g) Install new MCC-1, MCC-2, MCC-3, Panel PP1, PP2, and PP3. (h) Install four new VFDs for the sludge pumps. (i) Install all new feeder and load conductors, primarily in existing conduit. 8) Instrumentation and Control (a) Demolish existing PLC-9000 and PLC-9002 located in Electrical Rooms 106 and 107. (b) Install new PLC hardware and enclosure for PLC-9000 and 9002. (c) Install new network enclosure in Electrical Room 100 and run fiber for new MultiRake Bar Screen control panels. 2. Hickory Creek Interceptor a. Hickory Creek Interceptor - 60-inch Wastewater Interceptor Replacement 1) Installation of 60-inch RTRP extending approximately 2400 LF, with 2280 LF parallel to existing RCP Hickory Creek Interceptor and 120 LF in same trench as existing 60-inch PCCP Hickory Creek Interceptor 2) Establish connection of 60-inch RTRP to existing Special Manhole B 3) Bypass pumping 4) Install replacement of approximately 175 LF of 18-inch PVC filtrate pressure main 5) Relocate connection of 18-inch filtrate line to new 60-inch RTRP 6) Relocate connection of 30-inch plant sewer line to new 60-inch RTRP 7) Relocate connection of 8-inch condensate drain line to new 60-inch RTRP 8) Establish connection of new 60-inch RTRP to existing Hickory Creek Interceptor 9) Point Repair 18-inch HDPE Sludge Transfer Force Main 10) Coordinate temporary interruptions of service within defined shutdown parameters 11) Restore grounds along pipeline alignments to pre-existing conditions 12) Traffic control 13) Erosion protection 14) Grading 15) Miscellaneous clear/grub/seed 3. Additive Alternates a. Phase I, II, And III Primary Pump Stations Clarifier Sludge Piping Riser Replacement and/or Modification including, but not limited to: 1) Removal and disposal of existing piping and appurtenances 2) Demolition of existing concrete floor area near piping/appurtenance 3) Structural concrete repairs 4) Installation of new piping and appurtenances b. Anaerobic Digesters 9, 11 And 13 Roof Insulation Replacement (Spark Free Facility) including, but not limited to: 1) Removal and disposal of existing roof insulation 2) Protection of existing piping/appurtenances (gas piping system and others) 3) Installation of new roof insulation 4) Miscellaneous piping/appurtenances work c. Lagoon A Pump Station Valve and Gates Rehabilitation And Sidestream Connection Improvements, but not limited to: 1) Lagoon A Pump Station (a) Removal and disposal of existing piping, appurtenances, stem, guides, wheel and operators inside dry well (b) Removal and disposal of stems, guides, supports, wheels, and operators for 5 existing sluice gates inside wet well. Sluice gates to remain. (c) Removal and disposal of existing steel grating, handrails, existing concrete corbels (d) Installation of new piping, appurtenances, stems, guides, wheels and operators inside dry well (e) Installation of new stems, guides, supports, wheels, and operators for 5 existing sluice gates inside wet well. (f) Structural concrete repairs (g) Installation of new sump pump, inclusive of all piping/appurtenances (h) Miscellaneous electrical improvements (i) Traffic control 2) Lagoon A Divider Walls including: (a) Removal and disposal of stems, guides, supports, wheels, and operators for 4 existing sluice gates at divider walls. Sluice gates to remain. (b) Installation of new stems, guides, supports, wheels, and operators for 4 existing sluice gates at divider walls. (c) Structural concrete repairs 3) Sidestream Connection Improvements: (a) Install new sidestream connection (piping, appurtenances, etc.) (b) Asphalt pavements road repairs (c) Traffic control (d) Erosion protection (e) Grading (f) Miscellaneous clear/grub/seed d. Lagoon B Pump Station Improvements including, but not limited to: 1) Removal and disposal of existing below/above ground discharge piping, appurtenances, supports 2) Demolish existing Lagoon B Pump Station (mechanical, structural, electrical) 3) Sludge removal and shoring 4) Install new above ground discharge piping appurtenances, supports, and other miscellaneous work 5) Install new Lagoon B Pump Station (pumps, piping, flow meter, appurtenances, sluice gates, stems, guides, supports, operators, grating, handrails, new cast-in-place concrete structure, etc.) 6) Structural concrete improvements and repairs 7) Electrical, Instrumentation and Controls improvements. 8) Power Distribution System Study 9) Asphalt/Concrete pavements road repairs 10) Traffic control 11) Erosion protection 12) Grading 13) Miscellaneous clear/grub/seed M/WBE participation on this contract is as follows: Construction: 32.00% Final completion- 1095 calendar days

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents