Similar Projects
Construction of Lift Station 1 Relocation
Sub-Bidding
Maitland, FL 32751

Lift Station Replacement And Sewage Pipe Replacement at Maxwell Terrace Apartments
Post-Bid
$253,000 est. value
Orlando, FL 32805

Pump Station Package 23 Improvements
Post-Bid
Less than $2,116,000 est. value
Orlando, FL 32801

Bonnie Brook Pump Station Retrofit
Results
$112,506 est. value
FL

Downtown Lift Station 66 Construction Project
Results
Less than $640,000 est. value
Ocoee, FL

Lift Station 201 and Lift Station 205 Force Main Replacements
Results
$1,000,000 est. value
Orlando, FL

Master Pump Station Improvements
Results
Orlando, FL

Lift Stations 10 and 11 Upgrades
Results
Less than $1,768,500 est. value
Orlando, FL 32802

Town Center (PS 3497) and South Central (PS 3499) Master Pump Station Improvements
Results
Less than $7,373,590 est. value
Orlando, FL 32801

Pump Station Package 22 Improvements
Results
Less than $2,134,000 est. value
Orlando, FL 32837

Park Masterlift Station Replacement
Results
Eatonville, FL 32751

Lake Apopka North Shore Phase 4 Pump Station
Results
Less than $1,200,000 est. value
Apopka, FL 32703

Orange County Southwest Marriot Pump Station #3597 Odor Control System
Results
Less than $1,354,936 est. value
Orlando, FL 32821

Lift Station No. 45 Replacement
Results
Less than $6,500,000 est. value
Orlando, FL 32802

Lift Station #17 Rehabilitation
Results
Less than $350,000 est. value
Maitland, FL 32751

Last Updated 11/28/2018 01:58 PM
Project Title

Lift Station No. 1 Improvements

Physical Address View project details and contacts
City, State (County) Orlando, FL   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $16,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project consists of the improvement/replacement of Lift Station No.1 including demolition of selected portions of existing facilities at Lift Stations 1 and 7. The overall work consists of the construction of a new pumping station and enclosure building for the wet well, electrical generator, control equipment, pumps, bridge crane, and installation of different pipe sizes and depth for the gravity sanitary sewer and force-main, and construction of the dual chamber wet well for 6 pumps by Caisson Method. The project also includes installation of manholes, roadway improvements and other work as stated in the plans and specifications.
Details
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents