Similar Projects
Whitney Regional Park Continued Improvements - Phase I - PK.24.01 - City of St. Cloud
Demolition, New Construction, Infrastructure, Renovation
Conception
$6,000,000 CJ est. value
Saint Cloud, MN 56303

Whitney Regional Park Continued Improvements - Phase I - PK.24.01 - City of St. Cloud
Demolition, New Construction, Infrastructure, Renovation
Conception
$6,000,000 CJ est. value
Saint Cloud, MN 56303

County Road 136 Apartments
New Construction, Infrastructure
Design
$27,900,000 CJ est. value
Saint Augusta, MN 56301

County Road 136 Apartments
New Construction, Infrastructure
Design
$27,900,000 CJ est. value
Saint Augusta, MN 56301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Grading, Bituminous Surfacing, ADA Improvements, and Retaining Walls
Results
MN

2021 Park Improvements
Infrastructure
Results
$592,603 CJ est. value
Saint Augusta, MN 56301

Stone Gate Residential Development
New Construction, Infrastructure
Pending Verification
$24,900,000 CJ est. value
Saint Augusta, MN 56301

Stone Gate Residential Development
New Construction, Infrastructure
Pending Verification
$24,900,000 CJ est. value
Saint Augusta, MN 56301

Wastewater Treatment Facility Phase 3 - City of Saint Cloud
Addition, Infrastructure
Conception
$6,630,000 CJ est. value
Saint Augusta, MN 56301

Elbow Lane Retail Development
New Construction, Infrastructure - 11,000 SF
Design
$2,900,000 CJ est. value
Saint Cloud, MN 56303

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Grading, Bituminous Surfacing
Infrastructure
Results
MN

6th Street Office Addition
Addition, Infrastructure - 4,800 SF
Pending Verification
$1,000,000 CJ est. value
Saint Cloud, MN 56303

Last Updated 06/19/2023 03:33 AM
Project Title

Roads West - St. Cloud Veterans Administration

Physical Address View project details and contacts
City, State (County) Saint Cloud, MN 56303   (Stearns County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $5,214,159 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Roads West - St. Cloud VA Project involves a phased reconstruction of roadways on the western half of the campus, removal and replacement of designated portions of concrete sidewalk, and installation of storm sew er lines and manholes. This procurement is set-aside 100% for service disabled veteran ow ned small businesses (SDVOSB) and w ill result in a firm fixed-price contract. The magnitude of this requirement is between $1 million and $5 million. The North American Industry Classification System (NAICS) code is 237990 w ith a small business size standard of $45 million. SITE VISIT (CONSTRUCTION) (FEB 1995) - ALTERNATE I (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (b) An organized site visit has been scheduled for: April 13, 2023 at 10:00 AM (c) Participants will meet at: 4801 Veterans Drive Building 8, Room 112 (Auditorium) St. Cloud, MN 56303 ** NOTE: Contractors should enter the main facility at Building 1, proceed straight ahead, and then follow signage for Building 8 auditorium The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c): 1. Complete all contract work (including options if exercised, not including turf establishment) no later than October 31, 2024. 2. Complete turf establishment no later than October 31, 2025. The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by July 31, 2023. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer BIDDER INQUIRIES. Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must submit their questions using the ProjNet system at https://www.projnet.org Clause 52.214-6 requires that all inquiries be submitted in writing. To submit a new inquiry or to view inquiries submitted by other prospective bidders, users must be registered and signed into the ProjNet system. Bidders may register online at https://www.projnet.org (click on "Register"). The following information will be needed to submit or view bidder inquiries: Managing Agency: USACE The Solicitation Number is: W912ES22B0023 The Bidder Inquiry "Key" Number is: UQUCGV-3R9TUE *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents