Similar Projects
N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

N. A. Sandifer Bridge Maintenance
Infrastructure
Design
$615,136 CJ est. value
Monticello, MS 39654

Consturct Additional ORG Parking and POV Parking Louisville Readiness Center
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Louisville, MS 39339

Consturct Additional ORG Parking and POV Parking Louisville Readiness Center
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Louisville, MS 39339

Construction of 27.232 miles of Edge Repair, Base Repair, Leveling, Reseal, Sign and Stripe on Roads A-K
Post-Bid
MS

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

2020 Street Improvements
Results
Indianola, MS

Industrial Park Access Road
Results
Holly Springs, MS

Overlay of SR 28
Infrastructure
Design
$4,271,860 CJ est. value
Harriston, MS 39069

Grade, Drain, Base and Surfacing on the Road A- CR 3560(Bayberry Road)
Infrastructure
Bidding
$856,948 CJ est. value
Booneville, MS 38829

Barnes Road Overlay and Striping Project
Infrastructure
Post-Bid
Carthage, MS 39051

Overlay Approximately 4 Miles on US 84 from Old Hwy 27 to SR 184
Results
MS

Construction of an Asphalt Walking Trail
Infrastructure
Design
$300,000 CJ est. value
Inverness, MS 38753

Local System Bridge Program
Infrastructure
Bidding
$2,000,000 CJ est. value
Redwater, MS 39051

County Wide Micro-Surfacing Project
Infrastructure
Post-Bid
Quitman, MS

Last Updated 09/02/2022 12:04 AM
Project Title

2022 Roadway Improvements

Physical Address View project details and contacts
City, State (County) Morton, MS 39117   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,709,212 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes the Overlaying and Repairing Roads. The Contract Time will be One Hundred Twenty (120) consecutive calendar days, and the liquidated damages will be $400 per consecutive calendar day thereafter. Bids will be considered by the City of Morton at or before the next regular meeting thereof to be held within thirty (30) days of the date of receipt of bids. The City of Morton reserves the right to waive any and all informalities in the bidding and to reject any and all bids. Bids for this work will be accepted only under the name of the Bidder to whom the Contract Documents and Addenda, if any, have been issued by the Engineer. Bids received by bidders to whom the Contract Documents were not issued by the Engineer will be returned unopened. State law requires a non-resident bidder to attach/include a copy of his resident state's current law pertaining to such states treatment of non-resident contractors with their bid. Any bid submitted by a non-resident contractor which does not include the non-resident contractor's current state law shall be rejected and not considered for award. Bid Results: TOTAL BASE BID 1 - SCHEDULE 1 &SCHEDULE 2 Adcamp. Inc-$ 561,341.00 TOTAL BASE BID 2 - SCHEDULE 1 &SCHEDULE 2 Adcamp. Inc-$ 1,147,871.00

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents