Similar Projects
American Legion Building
Addition - 1,988 SF
Design
Delafield, WI 53018

2021 Heiden Haus
Renovation, Addition
Bidding
Madison, WI 53705

Hillcrest Park Pavilion
New Construction
Bidding
Waukesha, WI 53186

Indianhead Park Beach House Remodel
Renovation
Post-Bid
Mukwonago, WI 53149

Maintenance of Parks Facilities and Structures
Post-Bid
Less than $85,000 est. value
Manitowoc, WI 54220

Firemen's Park Shelter
Results
Germantown, WI 53022

2020 Lakeside Park Pavilion Addition and Alterations
Renovation, Addition
Results
Less than $1,200,000 est. value
Fond du Lac, WI 54935

Limestone Ridge Outdoor Pool
New Construction - 4,384 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Fitchburg, WI 53719

Indoor Shooting Range
New Construction - 30,000 SF
Pending Verification
$8,000,000 est. value
Lake Geneva, Lyons, WI 53147

Shoot Point Blank
New Construction - 13,187 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Greenfield, WI 53228

Cato Falls and Walla Hi Park Shelters
New Construction
Bidding
Kiel, WI 53042

Park Pavilion and Site Improvements Design RFP
New Construction
Post-Bid
Appleton, WI 54913

Indoor Group Camp Remodel
Renovation
Results
Less than $200,000 est. value
Bagley, WI 53801

Rome Town Center New Entertainment Pavilion
New Construction
Bidding
Nekoosa, WI 54457

Old Settlers Park Band Shelter
Post-Bid
Salem, WI 53168

Reported 01/19/2021 12:00 AM
Project Title

Torch Lake Campground Improvements - Phase 3

Physical Address View project details and contacts
City, State (County) Conover, WI   (Vilas County)
Category(s) Entertainment/Recreation
Sub-Category(s) Misc. Recreational
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the project consists of a new campground loop at Torch Lake campground. The scope of work includes excavation of existing site materials, stumping & grubbing, site grading, , water line construction, septic field construction, electrical systems, a prefabricated toilet building, crushed aggregate base course, concrete pavement, culverts, stormwater features, campsite construction, with associated erosion control, demolition, earthwork and site restoration. Additional Description: Stumping and grubbing to be completed prior to April 1, 2021.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents