Similar Projects
North Middletown Road Pedestrian Link Project
Bidding
Pearl River, NY 10965

New City Buildings and Infrastructure Improvements– Sheriff and Correctional Center Parking Lot Modifications
Post-Bid
New City, NY 10956

North Middletown Road Pedestrian Link
Post-Bid
Pearl River, NY 10965

North Broadway Sidewalks
Results
Upper Nyack, NY 10960

State Bicycle Route 9 Shared Use Path Construction
Results
Less than $2,800,000 est. value
Clarkstown, Stony Point, NY 10980

Furnish and Install Reinforced Concrete Pads and Sidewalk
Post-Bid
West Haverstraw, NY 10993

Intersection Reconfiguration on US Rte 202 in The town of Haverstraw
Results
Less than $4,900,000 est. value
Haverstraw, Ramapo, NY 10927

Asphalt Paving & Concrete Sidewalk Modifications
Renovation
Post-Bid
Congers, NY 10920

Miles of Asphalt Concrete Resurfacing and Construction of Sidewalk on Route 17
Results
Less than $5,400,000 est. value

Courthouse - Dutch Garden South Entrance and Parking - Human Rights Memorial
Post-Bid
New City, NY 10956

Pavement Preventative Maintenance including Mill and Fill, 1.8 Miles along Route 303, 2.9 Miles along Route 17
Results
Less than $5,100,000 est. value

Parking, Landscaping, Lighting and Related Work
Post-Bid
Grand View-on-Hudson, NY

Concrete Curb 8 and Sidewalk Replacement Program
Results
New City, NY 10956

Pedestrian Safety Improvements
Post-Bid
$250,000 to $300,000 est. value
Nyack, NY 10960

2020 Curb and Sidewalk Program - Hudson Avenue
Results
Haverstraw, NY 10927

Last Updated 07/16/2020 11:27 AM
Project Title

Curb Sidewalk and ADA Ramp Replacement - Fifth Avenue

Physical Address View project details and contacts
City, State (County) Nyack, NY 10960   (Rockland County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work for this project consists of the removal of existing curbs and sidewalk and replacement with new concrete curbs, sidewalks, drive aprons and compliant ADA ramps together with associated excavation, disposal, grading, and bituminous drive repairs. The limits of work are on primarily on the north side of Fifth Avenue between Front Street and Highland Avenue. The Emits are as shown on the contract plans and are to be marked in the field by the Village Engineer. The main components of the scope of work for the base bid of this project includes the construction of approximately 150 SY of concrete sidewalk, 5 inch thick, 40 SY of concrete apron, 6 inch thick, 380 LF of 8' X 9’ X 20* concrete vertical curb, and detectable warning surface. 32 SF, The Village will provide Traffic Control and Topsoil and Seed restoration.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents